Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
India · Jamnagar

Explosion proof phone for Jamnagar, Gujarat

Jamnagar, on the Gulf of Kutch coast of Gujarat, hosts a single industrial complex that combines two refineries, a petcoke gasification plant, a large petrochemical block and its own marine terminal. A shift here can involve a walk of kilometres between a control room and the unit being inspected, across several different hazardous-area classifications. That is why the choice of a handheld matters: a phone that cannot enter the classified area is left at the gate, and the job goes back to paper and radios. The SAMS IS-04Z1 is pre-launch: certification is in progress and no certificate has been issued yet.

Launching Q4 2026 · ATEX and IECEx certification in progress

SAMS IS-04Z1 explosion proof mobile phone, front view
Governing gas groupIICHydrogen-rich refinery streams set the group; marking target II 2 G Ex ib IIC T4
AvailabilityQ4 2026via authorised distributors
The site · Jamnagar

The site: Jamnagar, one complex on the coast

The complex sits near Motikhavdi village in Jamnagar district. It is organised as interlinked clusters: a domestic-area refinery, a refinery in the special economic zone, a gasification complex, a petrochemical complex and the utilities and offsites that serve them. Crude arrives by sea through offshore moorings, and products leave by sea, pipeline and road. Because one operator runs the whole site, equipment rules are consistent inside the fence, but contractors still meet them afresh at each gate.

Operators, EPCs and contractors

Reliance Industries
Operates the Jamnagar manufacturing division: both refineries, the gasification complex and the petrochemical units.
Reliance marine terminal
Offshore single point moorings for crude and product, plus jetty berths handling products, chemicals and LPG.
Sikka port
Port used mainly for Reliance's industrial cargo, linked to the refinery and petrochemical complex.
Nayara Energy at Vadinar
A separate refinery in the same district, covered on its own Vadinar page rather than here.
Turnaround and EPC contractors
Engaged project by project; scope, entry rules and approved-equipment lists are set by the operator.
Specialist inspection and service firms
Third-party crews on shutdowns who carry their own tools and must meet the same gate rules.

Classified units and areas

Crude distillation and conversion units
Hydrocarbon gas and hot liquids around heaters, columns, cokers and catalytic crackers.
Hydroprocessing units
Hydrogen-rich service, which decides the gas group for the whole site.
Petcoke gasification complex
Syngas containing hydrogen and carbon monoxide, plus petcoke handling where combustible dust can occur.
Aromatics and polymer units
Paraxylene and polypropylene chains with flammable liquids, gases and polymer powder in silos and bagging.
Tank farms and pump houses
Floating-roof tanks and manifold areas for crude, intermediates and products.
Jetties and offshore moorings
Ship-to-shore transfer of crude, products, chemicals and LPG at berths and moorings.
Built for local conditions

What Jamnagar does to portable equipment

Jamnagar combines scale, heat and a dry, dusty coastal setting. The handset has to cope with distance, a wide mix of hazards and a workforce that arrives from many states, and the paperwork has to satisfy the operator's own HSE team.

IP ratingIP68
Battery4,000 mAh
Camera50 MP
OSAndroid 16

A hot semi-arid climate with a short, erratic monsoon

Jamnagar has a hot semi-arid climate, with a wet season from June to September in which rainfall varies sharply from year to year. Pre-monsoon heat is the harder test for a handset sitting in a pocket or on a pipe rack. IP68 sealing addresses water and dust, but the ambient range that counts is the one stated on the certificate.

Hydrogen service across the refinery units

Hydrotreating and hydrocracking units circulate hydrogen-rich gas, and hydrogen falls in gas group IIC. A handset marked only for IIA or IIB would be turned back at those units. The marking target of II 2 G Ex ib IIC T4 is chosen so one device can be carried across the site, subject to the certificate being issued and the operator accepting it.

Gasification brings carbon monoxide and dust

A petcoke gasification plant handles syngas and solid fuel in the same footprint. Gas and combustible dust are both on the table, which is why Zone 21 is part of the IS-04Z1 design target alongside Zone 1. Which areas are actually classified for dust is a matter for the operator's area classification drawings.

Distances that make the nearest socket a long way off

On a complex of this size, a round can run for hours between the control room and the far end of a tank farm or jetty. A 4,000 mAh battery is specified around a shift rather than a half-day, though real runtime depends on screen use, camera use and network conditions, and should be measured in an evaluation.

Gujarati, Hindi and English on one fleet

Operators, contract workmen and visiting engineers do not share one first language. Android 16 supports English and Hindi with enterprise management, and EMM enrolment lets the operator push one approved configuration to every phone. Support for Gujarati and other interface languages should be confirmed against the datasheet.

Coastal moisture and salt at the jetties

Berths and moorings sit in humid, salt-laden air, and connectors and speaker meshes are where it shows first. A sealed body helps, but an evaluation should include a rinse-and-inspect routine agreed with the operator before any fleet is issued, rather than assuming IP68 alone covers a coastal service life.

Use cases · Jamnagar

Where the IS-04Z1 explosion proof mobile phone goes to work.

Refining01

Outside operator rounds on conversion units

An outside operator on a coker or hydrotreater round records readings, photographs a weeping flange and calls the control room from one device. Without a certified handset the round is notes on paper and a report written later. Which units the phone may enter depends on the certificate and the operator's own classification.

Gasification and utilities02

Inspection around syngas and petcoke handling

Inspectors working around gasification and coke handling need photographs, tag scans and a way to reach the permit holder quickly. NFC supports tag scanning where the plant has fitted tags. A phone does not replace the personal gas detector, which stays the safety device for carbon monoxide and hydrogen.

Petrochemicals03

Polymer and aromatics unit checks

Aromatics streams and polymer powder give a mixed gas and dust picture across a small area. One phone designed for both Zone 1 and Zone 21 avoids carrying separate devices between the process end and the silo and bagging end, again subject to certification and the operator's drawings.

Marine04

Jetty and mooring operations

Transfers of crude, products and LPG involve operator staff, marine crews and surveyors on the same berth. One managed phone for checklists, photographs and calls reduces the radios and clipboards carried along a jetty, where hands are often full and handling time matters.

Questions · Jamnagar

Frequently asked questions

Can we buy an explosion proof phone in Jamnagar today?

Not yet. The IS-04Z1 is pre-launch and its IECEx, ATEX and NEC 500 Class I Div 1 certification is in progress at TÜV in Germany ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the schedule and safe-area evaluation units are available now.

What does an explosion proof phone cost in Jamnagar?

No price is published. While certification is in progress there is no list price and no committed lead time. Indicative pre-launch pricing can be given in writing against a stated quantity and site. Be cautious of any supplier quoting a firm figure and delivery date for an uncertified Ex handset.

Which approvals will a Jamnagar plant ask for?

Hazardous-area equipment in India needs PESO approval, built on a recognised certificate such as IECEx, and the handset also needs BIS registration and WPC radio approval, as set out on the India page. The operator then applies its own acceptance rules, so confirm the requirement with its HSE and procurement teams.

Which gas group should we specify for a Jamnagar refinery?

Hydrogen-rich service on hydroprocessing units sets gas group IIC, and syngas from gasification also contains hydrogen. The IS-04Z1 marking target is II 2 G Ex ib IIC T4, with a Zone 1 and Zone 21 design target. The final marking is whatever the certificate states, and the operator's area classification decides where it may be used.

Who will support and repair the phone in Gujarat?

Support will be provided by SAMS together with the local partner SAMS is appointing for India. Service arrangements, repair turnaround and spares have not been published, and none should be assumed. Intrinsically safe equipment should be repaired only by a party with the right authority, so ask for the repair route in writing before any order.

Can the phones be managed centrally across a large site?

The IS-04Z1 runs Android 16 and is designed for enrolment in an enterprise mobility or device management system, so an operator can push one approved configuration, apps and policies to the whole fleet. Compatibility with a specific EMM product, and the site's network and security rules, should be tested in an evaluation.

Enquiry · Jamnagar

Ask about the IS-04Z1 for Jamnagar, India

Tell us the site, the zone and gas group, and roughly how many handsets. The SAMS team replies by email with the datasheet and the certification schedule for India. The IS-04Z1 is pre-launch and certification is in progress, so there is no list price yet; indicative pricing is issued in writing against a stated quantity and site.

Enquiry · Jamnagar

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter a valid phone number.
Please enter your target market.
Please select one.

Launching Q4 2026

Evaluating the IS-04Z1 for this site?

Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule for your market.