Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Saudi Arabia · SATORP

Explosion proof mobile phone for SATORP, Jubail

SATORP is the Aramco and TotalEnergies refinery and petrochemical complex at Jubail, built to run Arabian Heavy crude. This page is for the operations, HSE and telecoms people who need an explosion proof mobile phone for SATORP in Saudi Arabia, and it describes the areas such a handset would be carried into and what the IS-04Z1 is being designed to do there. The IS-04Z1 is designed around intrinsic safety rather than a flameproof enclosure.

Launching Q4 2026 · IECEx and dual-parent documentation in progress

SAMS IS-04Z1 explosion proof mobile phone, front view
Local approvalSASO · IECExIECEx · SASO in progress
AvailabilityQ4 2026via authorised distributors
The site · SATORP

Explosion proof mobile phone for a full-conversion refinery at Jubail

SATORP is owned 62.5 per cent by Saudi Aramco and 37.5 per cent by TotalEnergies. It was designed for 400,000 barrels a day of heavy crude and is a full-conversion refinery, which means residue is upgraded rather than sold as fuel oil. The route there runs through a large delayed coker, hydrotreaters and hydrocracking, with sulphur recovery for the sour feed and integrated petrochemical units downstream. Hydrogen is present throughout the hydroprocessing units and falls in gas group IIC, hydrogen sulphide is present on the sour side, and petroleum coke and sulphur are handled as solids. The site lies within Jubail Industrial City, so most of the people moving through it are either shift operators or contractors on a planned job.

Owners, neighbours and contractors

Saudi Aramco
Majority shareholder, with 62.5 per cent.
TotalEnergies
Minority shareholder, with 37.5 per cent.
Jubail Industrial City
Shared roads, utilities and emergency response with neighbouring plants.
SABIC affiliates
Adjacent petrochemical producers on the same industrial city.
Sadara Chemical
Aramco and Dow complex on the same industrial city.
EPC and turnaround contractors
Large temporary crews at each planned shutdown.

Classified units and areas

Crude and vacuum distillation
Hydrocarbon gas and liquid at high temperature, with heavy residue.
Delayed coker
Furnaces, coke drums and fractionation, plus coke handling.
Hydrotreating and hydrocracking
Hydrogen at pressure, a gas group IIC hazard.
Sulphur recovery
Hydrogen sulphide and sulphur, which is also a combustible dust.
Aromatics and olefin units
Light hydrocarbons in the downstream petrochemical section.
Tank farm and loading
Product and crude storage with loading arms and pumps.
Built for local conditions

What a heavy-oil refinery asks of a handset

The classified area at a refinery of this kind is large, continuous and hot. These are the points that matter once a handset has passed the certificate check and is in an operator's hand on the unit.

IP ratingIP68
Battery4,000 mAh
Camera50 MP
OSAndroid 16

Hydrogen means the IIC question comes up

Hydroprocessing puts hydrogen in the picture, so the gas group on the drawing matters. The marking target for the IS-04Z1 is II 2 G Ex ib IIC T4, and the certificate will state the scope once it is issued.

A coker site is dusty as well as gassy

Handling coke and sulphur brings combustible solids into the plant alongside the gas. The device is designed for Zone 21 dust as well as Zone 1 gas, and IP68 sealing keeps the fine material out.

Two shareholders, two review habits

An Aramco-style vendor review and a European, ATEX-influenced engineering culture can look at the same file with different questions. The IECEx documentation is being built to be readable by either, with the ATEX marking target stated plainly.

Planned shutdowns drive the workload

Turnaround work at a refinery of this size puts a large contractor crew through a limited number of gates. Handsets enrolled in an existing console can be issued, configured and collected centrally.

Heat above ground level and wind-blown sand

Furnace areas, hot piping and open desert summers all raise the temperature around the handset. The temperature class on the certificate is what the instrumentation engineer checks against the area's maximum surface temperature.

Use cases · SATORP

Where the IS-04Z1 goes to work at SATORP

Process01

Unit operator rounds

An operator walking the hydrotreater or the coker records readings, photographs a flange weeping and reports it to the control room without leaving the unit. One enrolled handset replaces the radio and camera that would otherwise be carried separately.

Shutdown02

Turnaround contractor crews

A contractor gang entering a coker or hydrocracker during a shutdown works to a permit issued that morning. The handset carries the permit application and site directory, and the operator's console controls what else is installed.

Inspection03

Tank farm and loading area checks

An inspector covering the tank farm needs a position and a photograph for each finding. Four-constellation GNSS and the 50 MP camera give a record that the maintenance planner can act on without a site visit.

Questions · SATORP

Frequently asked questions

Which shareholder's standards apply to equipment at SATORP?

That is for SATORP's own engineering and procurement teams to say. Ask them directly for the requirements that apply to a communications device, and what evidence they want with it.

Is the 62.5 and 37.5 per cent split relevant to us as a supplier?

Only indirectly. It tells you both companies have a stake in the engineering outcome, so expect questions from either side. It does not give any shareholder the right to approve a supplier on SATORP's behalf.

Does the IS-04Z1 cover hydrogen service?

It is being designed to Ex ib IIC, the gas group that includes hydrogen. The certificate will state its precise scope once issued, and an area drawing needs checking for temperature class as well as gas group.

Has SATORP approved the IS-04Z1?

No. It is pre-launch, certification is in progress ahead of Q4 2026, and no vendor approval can exist before the certificate does.

Enquiry · SATORP

Ask about the IS-04Z1 for SATORP, Saudi Arabia

Tell us the site, the zone and gas group, and roughly how many handsets. The SAMS team replies by email with the datasheet and the certification schedule for Saudi Arabia. The IS-04Z1 is pre-launch and certification is in progress, so there is no list price yet; indicative pricing is issued in writing against a stated quantity and site.

Enquiry · SATORP

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter a valid phone number.
Please enter your target market.
Please select one.

Launching Q4 2026

Evaluating the IS-04Z1 for this site?

Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule for your market.