Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Romania · Transgaz

Explosion proof mobile phone for Transgaz in Romania

Transgaz operates the Romanian national gas transmission system from its base in Mediaș: trunk pipelines, compressor stations, pressure reduction and metering sites, and the new interconnectors that move gas to and from neighbouring countries. This page is for the teams who need an explosion proof mobile phone in Romania that works at a compressor station or a pig trap and in a long pipeline corridor. The IS-04Z1 is designed around intrinsic safety rather than a flameproof enclosure.

Launching Q4 2026 · certification programme in progress

SAMS IS-04Z1 explosion proof mobile phone, front view
Local approvalATEXEU Directive 2014/34/EU · HG 245/2016 · in progress
AvailabilityQ4 2026via authorised distributors
The network · Transgaz

What is classified along a gas transmission system

A transmission operator has fewer people and more kilometres than a producer or a refinery. The classified places are scattered and mostly small: compressor stations, pressure reduction and metering stations, pig launcher and receiver traps, valve nodes and the delivery points where gas is odorised before it leaves the system. The BRUA corridor built across the country added a 479 km pipeline and three compressor stations at Podișor, Bibești and Jupa, the last with two Solar Turbines compressor units of 4.6 MW each. A further project to bring Black Sea gas ashore and into the system at Podișor is linked to the Neptun Deep development. The gas is natural gas, normally gas group IIA with a T1 class, so the question for a handset is less the gas than the number of sites, the pressure and the volume that could be released. Work in a classified area is controlled by permit, and the nearest colleague is often a long drive away.

Operating facilities

BRUA corridor
A 479 km trunk pipeline across Romania with three compressor stations.
Podișor
BRUA compressor station and the point where Black Sea gas is meant to enter the system.
Bibești
BRUA compressor station in the Oltenia region.
Jupa
BRUA compressor station in the west of the country, with Solar Turbines compressor units.
Pressure and metering stations
Entry and exit points to producers, storage, distributors and neighbouring systems.
Pig traps and valve nodes
Launcher and receiver areas used during pipeline inspection campaigns.

Classified situations

Compressor halls
Gas-turbine or engine halls with ventilation and gas detection as the primary control.
Pressure reduction
Regulator runs and relief outlets that vent small volumes of gas during operation.
Pig traps
Short Zone 1 or Zone 2 situations during launch and receipt, with the trap opened.
Odorant storage
Sulphur compound odorants stored and dosed at delivery points; strong smell, not an ignition source.
Vent and blowdown stacks
Release outlets whose zone depends on stack height and the gas released.
Gas measurement
Analyser cabinets and sampling lines classified as part of the station.
Built for the work · Transgaz

Why a Zone 1 mobile phone fits a gas transmission corridor in Romania

The device requirements are shaped by distance and by a small number of people doing safety-critical tasks alone.

IP ratingIP68
Battery4,000 mAh
Camera50 MP
OSAndroid 16

Distance as the main hazard

A compressor station may be a long way from the nearest office, so the handset is also the operator’s link to the dispatcher. 4G LTE and Wi-Fi give that link, and four-constellation GNSS gives the dispatcher a position that does not depend on a description.

Pig runs and their paperwork

A pig launch is a sequence of valve operations, permits and confirmations. A handset can carry the checklist and photograph the trap closure, so the record is made at the trap rather than reconstructed afterwards.

Heat from turbine halls

Compressor halls are warm and noisy, and the handset has to be usable with gloves and ear defenders. The certified ambient range will be published once the certificate fixes it; the T4 temperature class target is what a station engineer checks against the area classification.

Evidence for the explosion protection document

HG 1058/2006 puts the employer in charge of the explosion protection document. The gas group, marking string and declaration of conformity supplied with the device can be quoted in that document without paraphrase.

Contractor crews on shutdowns

Annual station shutdowns bring turbine specialists and instrument contractors. Android Enterprise enrolment lets the operator issue devices for the campaign and withdraw them afterwards.

Use cases · Transgaz

Where the IS-04Z1 goes to work on a transmission system.

Operations01

Station rounds at a compressor site

An operator records turbine readings, checks gas detection status and photographs a seal leak, with the position and time attached, and the dispatcher sees it as it is sent.

Inspection02

Pipeline inspection campaigns

During an in-line inspection, crews work at traps along the line. A common enrolled handset keeps the permit, the pig tracking record and the team’s positions in one place.

Commissioning03

New interconnector start-up

A new station brings commissioning engineers, vendors and the operator’s own staff together. A managed pool of handsets avoids personal phones in the classified halls.

Questions · Transgaz

Frequently asked questions

Does a gas transmission operator need a IIC handset?

Natural gas is gas group IIA, so IIA would meet the area classification on its own. A IIC marking target means one device can be issued across a transmission estate and into other sites, such as hydrogen-bearing industry, without being re-purchased.

Does Transgaz have a supplier approval process?

We have not verified any published supplier programme and do not claim one. Ask the Transgaz procurement and HSE teams what documentation an equipment supplier must provide.

Can the handset be used as a lone-worker device?

It provides position, a network connection and applications that can be configured for check-ins. Whether that meets a company’s lone worker policy is for the company’s HSE team to decide.

When can we test one?

Evaluation units are planned around the Q4 2026 launch, after certification. Request the datasheet and certification schedule and we will confirm what can be shared at each stage.

Enquiry · Transgaz

Ask about the IS-04Z1 for Transgaz, Romania

Tell us the site, the zone and gas group, and roughly how many handsets. The SAMS team replies by email with the datasheet and the certification schedule for Romania. The IS-04Z1 is pre-launch and certification is in progress, so there is no list price yet; indicative pricing is issued in writing against a stated quantity and site.

Enquiry · Transgaz

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter a valid phone number.
Please enter your target market.
Please select one.

Launching Q4 2026

Evaluating the IS-04Z1 for this site?

Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule for your market.