Gauging and inspection rounds
Tank gauging and seal checks happen on an outdoor round. A 50 MP camera with a position fix puts the photograph and the tank number on the same record, and IP68 sealing copes with rain and a wet roof.
Romania’s refining and fuel logistics chain runs from the Black Sea terminals at Constanța through the crude pipeline system to the refineries of Ploiești and the coast, and out through tank farms and loading gantries. This page is for the HSE and telecoms people who need an explosion proof mobile phone in Romania that works at a tank farm, a jetty and a pipeline pump station alike. The IS-04Z1 is designed around intrinsic safety rather than a flameproof enclosure.
Launching Q4 2026 · certification programme in progress
Where our company pages for OMV Petrom and Rompetrol Rafinare follow one operator, this page follows the product. Crude reaches Romania by sea at Constanța, where Oil Terminal operates storage of about 1.4 million cubic metres across three depots and can handle tankers of up to 150,000 tonnes deadweight. From there crude moves by the national pipeline system run by Conpet, from its base in Ploiești, to the refineries: Petrobrazi, the Ploiești platform, and Petromidia at Năvodari on the coast. Refined products then leave by rail, road and pipeline. Each step has its own classification: a berth with vapour displaced by loading, a tank farm with floating roofs and seal vapour, a pump station, a process unit and a loading gantry with a queue of tankers. A handset for this chain has to survive all of them.
The people who move fuel work in short, repeated tasks at many places. The handset needs to suit that pattern.
Tank gauging and seal checks happen on an outdoor round. A 50 MP camera with a position fix puts the photograph and the tank number on the same record, and IP68 sealing copes with rain and a wet roof.
A loading bay needs a bonding and overfill check each time. A handset can carry the checklist, scan the vehicle and record the result, replacing a clipboard in a wet bay.
A winter shift on the Constanța quay is exposed and windy. The 4,000 mAh battery is sized for a full shift, and the certified ambient range will be set by the certificate.
A refinery unit calls for IIC, a loading bay for IIB. The marking target of II 2 G Ex ib IIC T4 serves both, so a fuel logistics firm can issue one model across its sites.
Haulage drivers, surveyors, loading masters and maintenance crews each belong to a different employer. Android Enterprise policy lets the terminal control what enrolled devices can do, without touching anyone’s personal phone.
An operator at a Constanța depot reads gauges, checks bund drains and photographs a seal, with the tank number and position attached to each photograph, and sends them to the shift supervisor.
A crew visiting a pipeline pump station with a permit can check the isolation list and call the dispatcher from the same device without leaving the classified boundary.
During a refinery overhaul a managed pool of handsets lets contractors share the punch list and permit documents in one system.
The classification differs, but a Zone 1 handset with a IIC and T4 marking target covers both. The certificate and the explosion protection document for each place decide whether it may be taken there.
Oil Terminal, Conpet and the refiners are named because they run the facilities in this chain. Naming them is not a claim of any relationship with SAMS; we have none.
Terminal operators typically ask for contractor induction and equipment documentation. We have not verified a specific scheme for any named operator, so ask the terminal’s HSE and security teams what an equipment supplier must show.
No. Certification to ATEX 2014/34/EU, IECEx and NEC 500 is in progress and the launch is planned for Q4 2026.
Tell us the site, the zone and gas group, and roughly how many handsets. The SAMS team replies by email with the datasheet and the certification schedule for Romania. The IS-04Z1 is pre-launch and certification is in progress, so there is no list price yet; indicative pricing is issued in writing against a stated quantity and site.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule for your market.