Indonesia · bp Berau

Explosion proof mobile phone for bp Berau in Indonesia

An explosion proof mobile phone for bp Berau's Tangguh LNG operation in Indonesia has to suit one of the country's most remote industrial sites: an onshore plant and jetty at Teluk Bintuni in Papua Barat, fed by offshore platforms in Bintuni Bay. This page is for the HSE, operations and telecoms teams who decide what is carried into the classified areas. The IS-04Z1 is designed around intrinsic safety rather than a flameproof enclosure.

Launching Q4 2026 · certification programme in progress

SAMS IS-04Z1 explosion proof mobile phone, front view
Local approvalSNI · KomdigiIECEx · type approval and TKDN in progress
AvailabilityQ4 2026via authorised distributors
The site · Tangguh, Teluk Bintuni

What is classified at Tangguh LNG

bp Berau is the operator of the Tangguh production sharing contract, and the Tangguh facility turns offshore gas from Bintuni Bay into LNG for export and domestic supply. Gas is produced from offshore platforms and piped to the onshore plant, where it is treated, liquefied in three trains and stored in tanks until ships load at the jetty. The hazard is overwhelmingly gas: methane, hydrocarbon refrigerants, condensate and the treatment chemicals on the acid gas removal side. Dust is not the main story here, which is why the page on LNG and gas processing in Indonesia treats Bontang and Tangguh together. What makes Tangguh unusual is its location. Resupply, spare units and specialist help arrive by sea or air, so a handset that fails is not replaced the same afternoon.

Operators and contractors

bp Berau
Operator of the Tangguh production sharing contract.
SKK Migas
Indonesia's upstream regulator, which oversees production sharing contractors.
Maintenance and shutdown contractors
Mechanical, electrical and instrument crews, many working on rotation.
Marine and logistics contractors
Vessels, jetty services and supply support for a remote site.
Crew-change and supply providers
Air, sea and road support that moves people and spares to the site.

Classified areas and safe areas

Offshore platforms
Wellheads and process equipment in Bintuni Bay.
Subsea and onshore receiving
Pipeline arrival, slug handling and gas treatment.
Acid gas removal
Removal of CO2 and other gases from feed gas ahead of liquefaction.
Liquefaction trains
Three trains with hydrocarbon refrigerant circuits and cold equipment.
Storage and loading
LNG and condensate tanks, loading lines and the marine jetty.
Accommodation and offices
Safe areas outside the classified boundary.
Built for local conditions

What Tangguh does to an explosion proof phone

Tangguh puts a heavy gas plant in a tropical rainforest and sea environment, a long way from a service centre. These are the conditions that matter to a handset.

IP ratingIP68
Battery4,000 mAh
Camera50 MP
OSAndroid 16

Distance means self-sufficiency

Papua Barat is a long supply line from Java, so an evaluation has to cover spares, repair route and the lead time for a replacement. A sealed, drop-tested body reduces the number of units that fail in the first place.

Tropical rain and sea air

Heavy rain, humidity and salt are constant at a coastal plant and on a jetty. IP68 sealing is the design answer to water, and the certificate sets the ambient range the handset is allowed to work in.

Gas group IIC as the target

Hydrocarbon refrigerants and light gases can fall in different gas groups. A handset marked for IIC avoids having to issue different devices by unit. The IS-04Z1 marking target is II 2 G Ex ib IIC T4.

Rotation crews and shutdown surges

A train shutdown brings contractors flown in for the duration. The device is managed from existing MDM consoles, so enrolment at arrival and removal at departure can be handled by the operator's own team.

Positioning across a large site

A liquefaction complex with jetty, tanks and utility areas covers a large footprint. Four-constellation GNSS lets inspectors log position, and the 50 MP camera records the condition in the same step.

Work and approval · Tangguh

Rotations, shutdowns and approval for an explosion proof mobile phone at bp Berau

Tangguh runs as a rotation site: people work blocks of days on site and fly out. Planned work on a train brings extra contractors, and offshore trips are by boat or helicopter. An international operator group typically keeps its own engineering standards for electrical equipment in hazardous areas, in addition to the Indonesian regime. We do not know which standards govern handsets at Tangguh, so we have not named any. Ask bp Berau's engineering, HSE and procurement teams what evidence they need. IECEx documentation is the usual starting point, with Indonesian type approval handled separately.

Operations01

Plant rounds across the trains

Operators move between liquefaction trains, utilities and storage on long routes. A single handset carries readings, photographs, a torch and push-to-talk, replacing three items.

Shutdown02

Train turnaround inspection

During a planned shutdown, inspectors raise findings against tag numbers, photograph them in place and send them for planning without leaving the work front.

Marine03

Jetty and loading support

Jetty crews work outdoors in rain and spray around loading arms. A sealed handset with voice and camera supports inspection without a safe-area stop between each task.

Questions · bp Berau

Frequently asked questions

Is Tangguh a dust risk as well as a gas risk?

Mainly gas. The Zone 21 capability of the IS-04Z1 is useful if the same people also visit dust-handling facilities elsewhere, but at an LNG plant the classified areas are driven by gas.

Can the phone be repaired on site at Tangguh?

A device carrying an Ex certificate should not be opened by a general workshop, because that would invalidate it. The service route and spares holding for remote sites should be agreed before any purchase.

Does a Papua Barat site have different language needs?

The handset interface runs in English or Bahasa Indonesia. Local arrangements for training and manuals are for the operator and its distributor to agree.

Where do I find LNG-specific details for the other plants?

See the page on explosion proof phones for LNG and gas processing in Indonesia, which also covers Bontang and the other gas hubs.

Enquiry · bp Berau

Ask about the IS-04Z1 for bp Berau, Indonesia

Tell us the site, the zone and gas group, and roughly how many handsets. The SAMS team replies by email with the datasheet and the certification schedule for Indonesia. The IS-04Z1 is pre-launch and certification is in progress, so there is no list price yet; indicative pricing is issued in writing against a stated quantity and site.

Enquiry · bp Berau

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter a valid phone number.
Please enter your target market.
Please select one.

Launching Q4 2026

Evaluating the IS-04Z1 for this site?

Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule for your market.