Underground access
Equipment taken underground generally has to suit the mine's hazard classification and may need approval by the mine's own electrical or safety department.
A regional grouping rather than one site: Canada is a major producer of nickel, copper, potash and uranium, and the Sudbury Basin in Ontario is one of the world's largest nickel and copper ore suppliers. Underground diesel engines must have exhaust sampled at least monthly, and an engine is removed from service if exhaust carbon monoxide exceeds 2,000 ppm, a reminder of how closely air quality is controlled in coal mines. An intrinsically safe mobile phone distributor in Canadian mining regions would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Canadian mining regions has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | Canadian mining regions: Fuel storage, Explosives storage, Underground mine workings | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Canada Mining Operations. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Equipment taken underground generally has to suit the mine's hazard classification and may need approval by the mine's own electrical or safety department.
Winters in much of mining Canada are cold enough that battery performance, glove use on touchscreens and condensation are practical concerns.
Saskatchewan alone produces about 15 percent of the world's uranium, and hard-rock underground mining has long driven development in northern Canada.
Over half of the world's publicly listed exploration and mining companies were headquartered in Canada in 2013, and Toronto handles about 80 percent of global mining equity trades.
Mining contributed about 7.9 percent of Canada's GDP in 2021, roughly 156.5 billion Canadian dollars, split across extraction, services and manufacturing.
Industrial-scale mining began in the 18th century, with an iron mine at Forges du Saint-Maurice (1738 to 1883) and copper at Bruce Mines, Ontario from 1848, so many sites are old and complex.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In Canadian mining regions. Underground workings are often travelled on foot or by vehicle, with inspections and reporting done in several places. A handheld intrinsically safe phone avoids walking back to a safe point to log a defect. Where firedamp is present, the mine must still decide whether any device is suitable.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Canadian mining regions. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
Likely candidates are underground mine workings, ore processing plants, fuel storage, explosives storage. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Canadian mining regions.
Only if certified for the relevant area and permitted by the mine's rules; the federal regulations focus on gas detection, electrical equipment and ventilation, and each mine adds its own policy. Confirm with the mine manager and ask for the approved device list.
Cold winters, remote locations and long supply routes are typical, so batteries, spares and servicing need planning. Ask the mine about winter handling guidance and the temperature class they require for classified areas.
Not automatically. The IS-04Z1 target marking, II 2 G Ex ib IIC T4, is a gas-atmosphere marking. Underground equipment generally has to suit the mine's hazard classification and may need approval by the mine's own electrical or safety department. Ask the individual operator what it accepts before assuming suitability.
More on Canada Mining Operations, and on other places in Canada.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.