Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Jordan · Jordan Petroleum Refinery Company

Explosion proof mobile phone for JPRC, Zarqa refinery

Anyone specifying an explosion proof mobile phone in Jordan's downstream sector ends up at Zarqa. JPRC operates the country's only refinery there, which came onstream in 1961 and has been expanded in stages since, so one site carries several generations of plant. This page is for the HSE officers, instrumentation engineers and turnaround planners who have to decide what a person may carry into those units. The IS-04Z1 is designed around intrinsic safety rather than a flameproof enclosure.

Launching Q4 2026 · IECEx certification in progress

SAMS IS-04Z1 explosion proof mobile phone, front view
Local approvalJSMO · IECExIECEx · JSMO in progress
AvailabilityQ4 2026via authorised distributors
The site · Zarqa refinery

Explosion proof mobile phone requirements at the Zarqa refinery

The refinery was built by Snamprogetti and inaugurated in February 1961 at a small initial capacity, then expanded in phases through 1970, the mid-1970s and the early 1980s. Reference sources give its current capacity as about 60,000 barrels a day; a modernisation and a much larger fourth-phase expansion have been announced, and we do not assess their status. Beyond crude distillation, JPRC produces LPG, fills gas cylinders and runs a lubricants plant, and it owns an oil terminal and storage in Aqaba. A refinery is classified gas territory: Zone 1 and Zone 2 around process units, pumps, tanks and loading, with the gas group set by what a unit handles. Where a unit carries hydrogen-rich streams, IIC applies, which is why the marking target for the IS-04Z1 is Ex ib IIC.

Operators and neighbours

Jordan Petroleum Refinery Company
Operates the Zarqa refinery, LPG cylinder filling, lubricants and the Aqaba oil terminal.
JoPetrol
Separate fuel marketing and distribution company; runs its own procurement.
Honeywell UOP
Announced as technology provider for the expansion programme.
Expansion contractors
Engineering and construction firms named in announcements for the larger project.

Classified units and areas

Crude and vacuum distillation
Original core of the refinery, with the oldest classification drawings.
Upgrading and treating units
Hydrogen and light-hydrocarbon service where present; confirm per unit.
LPG storage and cylinder filling
Heavy-gas hazard, with a new LPG storage facility reported under construction.
Tank farms and loading bays
Product tanks and road tanker loading, where most contractor traffic passes.
Lubricants plant
Blending and filling, classified according to flash points handled.
Flare, utilities and pumphouses
Spread across the site with their own permit regimes.
Administration and laboratories
Safe-area buildings, outside the classified boundary.
Built for local conditions

What a 1961 refinery asks of a 2026 handset

The newest phone and the oldest drawing meet at Zarqa. The device has to fit the drawing, not the other way round.

Zones drawn in different decades

Areas added in the 1970s and 1980s were classified to the practice of their day, and revision has been piecemeal. A Zone 1, Ex ib IIC, T4 target is broad enough to cover the lot, but the temperature class still has to be checked unit by unit against the process fluids.

Long, narrow plot and heavy pipework

Tall columns and dense pipe racks make GNSS less reliable between structures. Four-constellation GNSS helps in open yards, and tag numbers and photographs from the 50 MP camera remain the primary record inside units.

Inland heat and dust

Zarqa sits on the edge of the desert, with hot summers and windblown dust. IP68 sealing keeps dust and wash-down water out, and the 4,000 mAh battery is specified for a shift without a safe-area charge.

Cameras on a site that controls photography

A refinery restricts photographs. A camera that can be switched off by policy through Android Enterprise and MDM is the usual answer, rather than a handset without one.

How work is organised

Continuous operation, planned turnarounds

A single refinery cannot stop for long without affecting national fuel supply, so shutdown windows are planned carefully and filled with contractor crews. We have not seen JPRC's turnaround calendar and do not state one. Operators work shifts with field rounds between units, while maintenance, inspection and contractor teams concentrate in tank farms, process units and pumphouses during outages. Permit volumes spike at turnaround, which is where a device that carries the permit, the site directory and a camera saves the most time. For the wider sector, see explosion proof phone for oil, gas and refining in Jordan.

Operations01

Field rounds between units

An outside operator logs pump and tank readings, photographs a leaking gland and reports it to the control room without a walk back to a safe area.

Turnaround02

Contractor permit and induction

Contractors arrive in a short window. Enrolled devices issued at induction hold the permit app and site directory, and are wiped when the job closes.

Loading03

Road tanker and LPG loading

Loading supervisors confirm product, compartment and bay by photograph and record, in a zone that treats a stray ignition source seriously.

Approvals and vendor access

What JPRC teams would ask an equipment supplier for

We have not verified JPRC's current supplier registration steps and describe none. Ask its procurement and HSE teams for supplier requirements and its equipment selection rules for classified areas. Expect requests for the Ex certificate and complete marking string, the temperature class and ambient range, a radio type approval reference, user documentation in Arabic and English and a written service route.

The IS-04Z1 does not yet hold any of those. IECEx and ATEX certification are in progress ahead of the Q4 2026 launch, and the datasheet and certification schedule can go into a review now. Supply is normally expected to run through a Jordanian-registered partner, as the Jordan country page explains.

Questions · Jordan Petroleum Refinery Company

Frequently asked questions

Is the Zarqa refinery the same as JoPetrol?

No. JPRC runs the refinery, LPG filling and lubricants; JoPetrol markets and distributes fuel. Each has its own procurement, so a conversation with one does not stand in for the other.

How does an expansion project affect device choice?

A large construction programme brings new contractors and new classified areas to a live site. Devices issued under one enrolled policy keep that traffic manageable, but the area drawings for new units come from the project, not from us.

Does the device suit hydrogen service?

The marking target is Ex ib IIC, which covers hydrogen, but the certificate and the unit classification decide, not the label. Check each unit's gas group and temperature class with JPRC engineering.

Can it be used in laboratories and control rooms?

Yes, those are normally safe areas, where it works as an Android Enterprise phone. Its value is crossing the boundary into process areas without changing device.

Enquiry · Jordan Petroleum Refinery Company

Ask about the IS-04Z1 for Jordan Petroleum Refinery Company, Jordan

Tell us the site, the zone and gas group, and roughly how many handsets. The SAMS team replies by email with the datasheet and the certification schedule for Jordan. The IS-04Z1 is pre-launch and certification is in progress, so there is no list price yet; indicative pricing is issued in writing against a stated quantity and site.

Enquiry · Jordan Petroleum Refinery Company

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter a valid phone number.
Please enter your target market.
Please select one.

Launching Q4 2026

Evaluating the IS-04Z1 for this site?

Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule for your market.