A whole shift in the plant
There is no charging point inside a classified area and the walk to one at Záluží is not short. The 4,000 mAh battery is specified to cover a full shift with the camera and a maintenance application in use.
An explosion proof mobile phone for Orlen Unipetrol has to cover two refineries, the country's largest chemical complex and a contractor population that swells every time a unit comes down. Orlen Unipetrol is the Czech refining and petrochemical group owned by the Polish PKN Orlen, running refineries at Litvínov and Kralupy nad Vltavou and the petrochemical plants at Záluží. This page is for the HSE officers, operations managers and telecoms teams deciding what may be carried past the gate in the Czech Republic. The IS-04Z1 is designed around intrinsic safety rather than a flameproof enclosure.
Launching Q4 2026 · certification and vendor documentation in progress
Záluží near Litvínov is described by the company as the largest chemical production site in the Czech Republic. The steam cracker there was commissioned in 1979 and has ten cracking furnaces, and it is the starting point for the polyethylene and polypropylene units downstream. The refinery shares the site. Kralupy nad Vltavou, on the Vltava north of Prague, is the group's second refinery and makes fuels and agrochemical products. Both refineries now receive crude through the IKL pipeline fed by the TAL line from Trieste, which is covered on the MERO ČR page. The hazards are the usual refinery and olefin plant list with some particular emphasis. Ethylene is gas group IIB, hydrogen is IIC, and naphtha, propylene and gasoline vapours are IIA, so a plant-wide device standard has to be rated for IIC to be usable in the cracker's hydrogen and ethylene areas. The polyolefin side adds powder and pellet handling, where dust classification studies apply, which is the reason the Zone 21 design target matters here.
On a site of this size the walk between units is long, the units are interdependent and a handset has to be useful in both gas and powder areas. These are the points that usually come up.
There is no charging point inside a classified area and the walk to one at Záluží is not short. The 4,000 mAh battery is specified to cover a full shift with the camera and a maintenance application in use.
The design target of II 2 G Ex ib IIC T4 is aimed at the more demanding gas groups. The certificate, once issued, states the exact marking, which your own classification drawings are checked against.
Zone 21 dust protection sits in the same certification programme, so one device can cross from the cracker area to a polymer powder area without a separate device for each.
Planned outages at the Litvínov petrochemical plant have run to several weeks, with refinery units elsewhere on the site kept in operation. Android Enterprise enrolment, restriction and wipe handle a crew arriving and leaving.
Czech instructions and the declaration of conformity are being prepared alongside English, and PKN Orlen's own documentation expectations should be asked for at the start.
An operator walks a unit, records readings and reports a leak with a photograph and a position. The managed handset replaces the radio and the paper round sheet.
Large contractor crews work to permits issued each day. The permit, the drawing and the daily report run on a locked-down device that can be wiped and reissued at crew change.
Gantry and tank farm crews check equipment in vapour areas away from the main units, where a handset replaces both camera and radio.
A formal registration route for Orlen Unipetrol or the PKN Orlen group has not been verified for this page, so none is named. Ask the procurement and HSE teams.
No. It is pre-launch and ATEX certification is in progress ahead of the Q4 2026 launch.
Hydrogen is a gas group IIC substance and ethylene is IIB. A single standard device for plant-wide use needs to cover the most demanding group present.
The legal framework is the same ATEX one across the EU. Group engineering standards may add to the documentation requested, which is a question for the operator's own teams.
They belong to the same group, but each site has its own hazards and its own equipment review, so do not assume a decision at one carries to another.
Tell us the site, the zone and gas group, and roughly how many handsets. The SAMS team replies by email with the datasheet and the certification schedule for Czech Republic. The IS-04Z1 is pre-launch and certification is in progress, so there is no list price yet; indicative pricing is issued in writing against a stated quantity and site.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule for your market.