Pipeline-fed
Gas arrives from the Montney Formation via the 670 km Coastal GasLink pipeline, built and operated by TC Energy.
LNG Canada is a liquefied natural gas export terminal at Kitimat on the British Columbia coast, with two trains and an initial 14 million tonnes per year. The plant produced its first LNG and shipped its first cargo in June 2025, the second train started in November 2025 and by 23 February 2026 it had shipped 50 cargoes. Distribution partners for LNG Canada, Kitimat are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. LNG Canada, Kitimat has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | LNG Canada, Kitimat: Gas receipt from pipeline, Marine loading jetty, LNG liquefaction trains | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Kitimat LNG. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Gas arrives from the Montney Formation via the 670 km Coastal GasLink pipeline, built and operated by TC Energy.
Further trains have been proposed as a possible second phase, so construction and commissioning activity may continue.
The second phase is an 18 billion dollar liquefaction and storage plant in the port of Kitimat, where natural gas is cooled to liquid and stored awaiting shipment.
LNG Canada is a joint venture of Shell (40 percent), Petronas (25), PetroChina (15), Mitsubishi (15) and KOGAS (5), with a total investment estimated at about 40 billion dollars approved on 1 October 2018.
Kitimat was planned and built by Alcan in the 1950s, and Rio Tinto's aluminium smelter is still the main employer; other local activity includes engineering, metal fabrication and imports of methanol and condensate.
The terminal was designed with two liquefaction trains totalling 14 million tonnes per year, with the option of two more trains to raise capacity to 26 million tonnes per year.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In LNG Canada, Kitimat. The plant produced its first LNG in June 2025, and construction and commissioning activity may continue. Walk-down inspections of liquefaction trains, storage and loading areas suit an intrinsically safe handheld that records findings on the spot. Permits for work in classified areas remain with the operator.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for LNG Canada, Kitimat yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
Likely candidates are lng liquefaction trains, lng storage and loading, gas receipt from pipeline, marine loading jetty. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for LNG Canada, Kitimat.
It shipped its first cargo in June 2025 and a second train started later that year, so work is moving from construction to operations, with expansion discussed. Confirm the current phase and contractor structure with the owners.
JGC Fluor led engineering and construction, and TC Energy built the Coastal GasLink pipeline. Operations contractors now vary, so confirm the current inductions and approved-device lists with LNG Canada's contractor management team.
The plant produced its first LNG and shipped its first cargo in June 2025, and the second train was reported to begin operating in November 2025. Further trains have been proposed as a possible second phase, so construction and commissioning activity may continue. Confirm current status with the project operator.
More on Kitimat LNG, and on other places in Canada.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.