Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Kitimat LNG · ATEX and IECEx

ATEX and IECEx Mobile Phone in Kitimat LNG

LNG Canada is a liquefied natural gas export terminal at Kitimat on the British Columbia coast, with two trains and an initial 14 million tonnes per year. Gas handling, liquefaction and ship loading create Zone 1 and Zone 2 areas. This page explains what to look for in an ATEX and IECEx mobile phone for LNG Canada, Kitimat, and where the IS-04Z1 stands against that list today.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Kitimat LNG, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicATEX and IECEx
DeviceMobile Phone
RouteSpecification
WhereKitimat LNG

Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for LNG Canada, Kitimat: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.

Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.

At a glance · ATEX and IECEx

Checklist: ATEX and IECEx mobile phone for LNG Canada, Kitimat

Checks a reviewer should make, with the IS-04Z1 position
CheckWhat to look forIS-04Z1 today
MarkingII 2 G Ex ib IIC T4 on the rating plateDesign target; not yet marked
EU-type examination certificateNotified body number and certificate IDIn progress with TÜV; not issued
IECEx certificate of conformityNumber listed on the IECEx online registerIn progress; not issued
Where it appliesLNG Canada, Kitimat: LNG liquefaction trains, LNG storage and loading, Gas receipt from pipelineClassified by the site operator
Product · Kitimat LNG

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Kitimat LNG. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The site · LNG Canada, Kitimat

Working in LNG Canada, Kitimat: operators and classified areas

The companies on site and the hazardous-area types a handset is likely to meet there.

Operators and companies on site

  • LNG Canada (Shell 40%, PETRONAS 25%, PetroChina 15%, Mitsubishi 15%, KOGAS 5%)

Classified areas to expect

  • LNG liquefaction trains
  • LNG storage and loading
  • Gas receipt from pipeline
  • Marine loading jetty
Local conditions · LNG Canada, Kitimat

Site conditions at LNG Canada, Kitimat: what wears and what limits equipment

Start-up status

The plant produced its first LNG and shipped its first cargo in June 2025; the second train was reported to begin operating in November 2025.

Pipeline-fed

Gas arrives from the Montney Formation via the 670 km Coastal GasLink pipeline, built and operated by TC Energy.

Field notes · LNG Canada, Kitimat

More about LNG Canada, Kitimat that matters for portable equipment

LNG Canada, Kitimat: projects and investment

The second phase is an 18 billion dollar liquefaction and storage plant in the port of Kitimat, where natural gas is cooled to liquid and stored awaiting shipment.

LNG Canada, Kitimat: projects and investment

LNG Canada is a joint venture of Shell (40 percent), Petronas (25), PetroChina (15), Mitsubishi (15) and KOGAS (5), with a total investment estimated at about 40 billion dollars approved on 1 October 2018.

LNG Canada, Kitimat: industry on the ground

Kitimat was planned and built by Alcan in the 1950s, and Rio Tinto's aluminium smelter is still the main employer; other local activity includes engineering, metal fabrication and imports of methanol and condensate.

LNG Canada, Kitimat: infrastructure

The terminal was designed with two liquefaction trains totalling 14 million tonnes per year, with the option of two more trains to raise capacity to 26 million tonnes per year.

The term · ATEX and IECEx

What “ATEX and IECEx” means for a smartphone

ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.

For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.

In LNG Canada, Kitimat. A reviewer at LNG Canada in Kitimat, a venture of Shell, PETRONAS, PetroChina, Mitsubishi and KOGAS, would expect certificate evidence of the kind common on international LNG projects. A dual ATEX and IECEx route suits a site with an international owner group. The IS-04Z1 is in certification and has no certificate.

The route · specification

Specifying an ATEX and IECEx mobile phone for Kitimat LNG

A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.

Check on the paper

Marking
Equipment group, category, protection concept, gas group and temperature class, matched to the area drawing.
Certificate and schedule
A certificate number, issuing body and the schedule of conditions, not a brochure claim.
Standards edition
The IEC 60079 or national standard edition the certificate was issued against.

Check for the IS-04Z1

Marking target
II 2 G Ex ib IIC T4: a target, not yet a certificate.
Certificate status
IECEx, ATEX, UKEX and NEC 500 in progress; none issued.
Operator approval
Separate from the certificate and handled with the site operator.
Questions · Kitimat LNG

Frequently asked questions

Can we buy an ATEX and IECEx mobile phone in Kitimat LNG today?

Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.

What does an ATEX and IECEx mobile phone in Kitimat LNG cost?

There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.

Is the IS-04Z1 ATEX and IECEx certified?

Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.

Which areas at LNG Canada, Kitimat would use it?

Likely candidates are lng liquefaction trains, lng storage and loading, gas receipt from pipeline, marine loading jetty. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.

Is intrinsically safe the same as explosion proof?

Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.

What hazardous areas does an LNG export plant have?

Typically liquefaction trains, refrigerant (propane, ethylene or mixed refrigerant) storage, LNG tanks and loading, flare and gas treatment areas. Gas groups include methane (IIA) and possibly propane or ethylene. Confirm zone drawings with the plant operator.

How do cold-climate conditions at Kitimat affect devices?

LNG plants use cryogenic fluids, so cold surfaces, ice and moisture are concerns around process areas. Choose sealed devices and confirm operator guidance on temperature class and ingress protection.

Where does the gas for Kitimat come from?

Gas arrives from the Montney Formation through the 670 km Coastal GasLink pipeline, built and operated by TC Energy. A device used at gas receipt would be in a hydrocarbon gas area, so the operator's classification and gas group data should be reviewed. Ask the plant owner for the relevant records.

Enquiry · LNG Canada, Kitimat

Ask about the IS-04Z1 for LNG Canada, Kitimat, Canada

Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.

Enquiry · LNG Canada, Kitimat

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Kitimat LNG?

Name the site and the operator and we will send what is available before launch.