Kitimat was planned and built by Alcan in the 1950s, and Rio Tinto's aluminium smelter is still the main employer; other local activity includes engineering, metal fabrication and imports of methanol and condensate. Gas handling, liquefaction and ship loading create Zone 1 and Zone 2 areas. If you are specifying an Ex-proof mobile phone for LNG Canada, Kitimat, this page covers the markings, the approvals and the current certification status of the IS-04Z1.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Kitimat LNG, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicEx-proof
DeviceMobile Phone
RouteSpecification
WhereKitimat LNG

Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for LNG Canada, Kitimat: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.

Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.

At a glance · Ex-proof

Checklist: Ex-proof mobile phone for LNG Canada, Kitimat

What to check, and where the IS-04Z1 stands today
CheckWhat to look forIS-04Z1 today
Ex markingGroup, category, protection concept, gas group, temperature classII 2 G Ex ib IIC T4 (target)
Gas groupIIA, IIB or IIC matched to the area drawingIIC (target)
Temperature classT-class below the ignition temperature of the gasT4, 135 °C (target)
Where it appliesLNG Canada, Kitimat: LNG liquefaction trains, LNG storage and loading, Gas receipt from pipelineClassified by the site operator
Product · Kitimat LNG

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Kitimat LNG. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The site · LNG Canada, Kitimat

LNG Canada, Kitimat at a glance: who is there, what is classified

A short profile of the site and the kinds of classified area that matter for portable equipment.

Operators and companies on site

  • LNG Canada (Shell 40%, PETRONAS 25%, PetroChina 15%, Mitsubishi 15%, KOGAS 5%)

Classified areas to expect

  • LNG liquefaction trains
  • LNG storage and loading
  • Gas receipt from pipeline
  • Marine loading jetty
Local conditions · LNG Canada, Kitimat

Conditions in LNG Canada, Kitimat that affect handheld equipment

Expansion plans

Further trains have been proposed as a possible second phase, so construction and commissioning activity may continue.

Start-up status

The plant produced its first LNG and shipped its first cargo in June 2025; the second train was reported to begin operating in November 2025.

Field notes · LNG Canada, Kitimat

More about LNG Canada, Kitimat that matters for portable equipment

LNG Canada, Kitimat: logistics and access

LNG carriers sail up and down the Douglas Channel to the port of Kitimat to load, mainly for Asian markets, using a new carrier terminal connected to the liquefaction and storage plant.

LNG Canada, Kitimat: background

The plant produced its first LNG and shipped its first cargo in June 2025, the second train started in November 2025 and by 23 February 2026 it had shipped 50 cargoes.

LNG Canada, Kitimat: logistics and access

Gas arrives via the 670 km Coastal GasLink pipeline built by TC Energy, with an initial capacity of about 2.1 billion cubic feet a day and potential expansion to about 5 billion.

LNG Canada, Kitimat: projects and investment

The second phase is an 18 billion dollar liquefaction and storage plant in the port of Kitimat, where natural gas is cooled to liquid and stored awaiting shipment.

The term · Ex-proof

What “Ex-proof” means for a smartphone

“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.

The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.

In LNG Canada, Kitimat. Natural gas is the hydrocarbon here, and a marking check would compare the gas group and temperature class on the device with the operator's area data for liquefaction and gas receipt. The IS-04Z1 target marking is II 2 G Ex ib IIC T4, subject to certification and the operator's acceptance.

The route · specification

Specifying an Ex-proof mobile phone for Kitimat LNG

A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.

Check on the paper

Marking
Equipment group, category, protection concept, gas group and temperature class, matched to the area drawing.
Certificate and schedule
A certificate number, issuing body and the schedule of conditions, not a brochure claim.
Standards edition
The IEC 60079 or national standard edition the certificate was issued against.

Check for the IS-04Z1

Marking target
II 2 G Ex ib IIC T4: a target, not yet a certificate.
Certificate status
IECEx, ATEX, UKEX and NEC 500 in progress; none issued.
Operator approval
Separate from the certificate and handled with the site operator.
Questions · Kitimat LNG

Frequently asked questions

Can we buy an Ex-proof mobile phone in Kitimat LNG today?

Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.

What does an Ex-proof mobile phone in Kitimat LNG cost?

No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.

What Ex marking will the IS-04Z1 carry?

The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.

Which areas at LNG Canada, Kitimat would use it?

Likely candidates are lng liquefaction trains, lng storage and loading, gas receipt from pipeline, marine loading jetty. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.

Is intrinsically safe the same as explosion proof?

Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.

What hazardous areas does an LNG export plant have?

Typically liquefaction trains, refrigerant (propane, ethylene or mixed refrigerant) storage, LNG tanks and loading, flare and gas treatment areas. Gas groups include methane (IIA) and possibly propane or ethylene. Confirm zone drawings with the plant operator.

How do cold-climate conditions at Kitimat affect devices?

LNG plants use cryogenic fluids, so cold surfaces, ice and moisture are concerns around process areas. Choose sealed devices and confirm operator guidance on temperature class and ingress protection.

Where does the gas for Kitimat come from?

Gas arrives from the Montney Formation through the 670 km Coastal GasLink pipeline, built and operated by TC Energy. A device used at gas receipt would be in a hydrocarbon gas area, so the operator's classification and gas group data should be reviewed. Ask the plant owner for the relevant records.

Enquiry · LNG Canada, Kitimat

Ask about the IS-04Z1 for LNG Canada, Kitimat, Canada

Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.

Enquiry · LNG Canada, Kitimat

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Kitimat LNG?

Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.