Investment programme
Petrobras plans US$4.6 billion for Reduc in 2026-2030, with maintenance shutdowns of the coking and hydrotreating units scheduled in 2026.
Duque de Caxias is an industrial municipality on Guanabara Bay about 17 km from downtown Rio de Janeiro. The Reduc delayed coking unit started operating in July 2008 after an investment of about one billion dollars, converting heavy feedstock into diesel and naphtha and producing petroleum coke. Distribution partners for Duque de Caxias are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Duque de Caxias has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Duque de Caxias: Loading and dispatch areas, Biofuel (SAF and renewable diesel) processing, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Duque de Caxias. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Petrobras plans US$4.6 billion for Reduc in 2026-2030, with maintenance shutdowns of the coking and hydrotreating units scheduled in 2026.
The refinery sits in the dense Rio metropolitan area with road links to the city and airport.
Reduc is listed among the Petrobras refineries receiving modernisation (revamp) projects in the company's refining investment portfolio, alongside Replan and the Presidente Bernardes refinery.
Reduc sells about 55 different products, the most of any Petrobras refinery, from diesel, jet fuel and asphalt to LPG, paraffins, lubricants, coke and sulphur, so many hazardous product streams are handled on site.
Petrobras has installed a reverse osmosis system supplied by SETA to treat and reuse refinery effluents, an example of the water-management projects that run alongside normal operations.
Reduc began operating in 1961 near Rio de Janeiro, one of the early refineries built after Petrobras was created in 1953 with a legal monopoly.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Duque de Caxias. The refinery is in the dense Rio metropolitan area with road links to the city and airport, so contractor fleets arrive easily and MDM enrolment, spares and charging are simple to organise. Charging stays in safe areas. Large shutdown workforces will need a managed fleet, not loose devices.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Duque de Caxias yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are refinery process units, tank farms and pipelines, loading and dispatch areas, biofuel (saf and renewable diesel) processing. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Duque de Caxias.
Typically choose a device with the right zone, gas group and temperature class, carry its certificate, and confirm local radio approval requirements. Many sites also require induction and an approved-equipment check at the gate, so allow time for that.
Lubricant plants and gas processing mean both flammable liquids and flammable gases can occur, sometimes with hydrocarbon vapours near ambient temperature. Ask the operator for the applicable gas groups; do not assume one device rating covers every unit.
Maintenance shutdowns of the coking and hydrotreating units are scheduled in 2026, which brings large contractor numbers into classified areas. Plan lead times early. Certification is in progress, so confirm schedules and requirements with the site operator and its HSE team.
Other guides for Duque de Caxias, other places in Brazil, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.