Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Duque de Caxias · ATEX and IECEx

ATEX and IECEx Mobile Phone Distributor in Duque de Caxias

Duque de Caxias is an industrial municipality on Guanabara Bay about 17 km from downtown Rio de Janeiro. The Duque de Caxias refinery complex covers about 13 square kilometres beside Rodovia Washington Luis in the Campos Eliseos district, making it a very large industrial site inside the Rio de Janeiro metropolitan area. An ATEX and IECEx mobile phone distributor in Duque de Caxias would carry the IS-04Z1 to these buyers once certification completes.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Duque de Caxias, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicATEX and IECEx
DeviceMobile Phone
RouteDistribution
WhereDuque de Caxias

Short answer. Duque de Caxias has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.

For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.

At a glance · ATEX and IECEx

Checklist: ATEX and IECEx mobile phone for Duque de Caxias

What to check, and where the IS-04Z1 stands today
CheckWhat to look forIS-04Z1 today
MarkingII 2 G Ex ib IIC T4 on the rating plateDesign target; not yet marked
EU-type examination certificateNotified body number and certificate IDIn progress with TÜV; not issued
IECEx certificate of conformityNumber listed on the IECEx online registerIn progress; not issued
Where it appliesDuque de Caxias: Loading and dispatch areas, Biofuel (SAF and renewable diesel) processing, Refinery process unitsClassified by the site operator
Product · Duque de Caxias

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Duque de Caxias. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The site · Duque de Caxias

Duque de Caxias at a glance: who is there, what is classified

A short profile of the site and the kinds of classified area that matter for portable equipment.

Operators and companies on site

  • Petrobras (Reduc refinery)

Classified areas to expect

  • Refinery process units
  • Tank farms and pipelines
  • Loading and dispatch areas
  • Biofuel (SAF and renewable diesel) processing
Local conditions · Duque de Caxias

What Duque de Caxias means for portable equipment

Investment programme

Petrobras plans US$4.6 billion for Reduc in 2026-2030, with maintenance shutdowns of the coking and hydrotreating units scheduled in 2026.

Urban setting

The refinery sits in the dense Rio metropolitan area with road links to the city and airport.

Field notes · Duque de Caxias

More about Duque de Caxias that matters for portable equipment

Duque de Caxias: industry on the ground

Reduc sells about 55 different products, the most of any Petrobras refinery, from diesel, jet fuel and asphalt to LPG, paraffins, lubricants, coke and sulphur, so many hazardous product streams are handled on site.

Duque de Caxias: infrastructure

Petrobras has installed a reverse osmosis system supplied by SETA to treat and reuse refinery effluents, an example of the water-management projects that run alongside normal operations.

Duque de Caxias: background

Reduc began operating in 1961 near Rio de Janeiro, one of the early refineries built after Petrobras was created in 1953 with a legal monopoly.

Duque de Caxias: projects and investment

The Reduc delayed coking unit started operating in July 2008 after an investment of about one billion dollars, converting heavy feedstock into diesel and naphtha and producing petroleum coke.

The term · ATEX and IECEx

What “ATEX and IECEx” means for a smartphone

ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.

For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.

In Duque de Caxias. At the Reduc refinery in Duque de Caxias, reviewers will want certificate evidence that fits Brazil's Inmetro-accredited route. A dual ATEX and IECEx route is designed to help international contractors on the investment programme. The IS-04Z1 has no certificate yet; this is in progress.

The route · distribution

Distributing the IS-04Z1 in Duque de Caxias

A distributor for Duque de Caxias would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.

What SAMS looks for in a partner

Operator relationships
Existing supplier registrations or a clear route to them with the main operators and contractors in Duque de Caxias.
Ex-competent staff
People who understand zone classification, markings and the conditions of a certificate.

And equally important

Local-language support
Documentation, training and helpdesk in the languages the workforce uses.
Service capability
Spares, battery replacement and repair routed through SAMS-approved channels.
Questions · Duque de Caxias

Frequently asked questions

Can we buy an ATEX and IECEx mobile phone in Duque de Caxias today?

No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.

What does an ATEX and IECEx mobile phone in Duque de Caxias cost?

There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.

Is the IS-04Z1 ATEX and IECEx certified?

Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.

Which areas at Duque de Caxias would use it?

Likely candidates are refinery process units, tank farms and pipelines, loading and dispatch areas, biofuel (saf and renewable diesel) processing. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.

How do I become a SAMS distributor for Duque de Caxias?

Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Duque de Caxias.

How should I plan devices for a Rio de Janeiro refinery visit?

Typically choose a device with the right zone, gas group and temperature class, carry its certificate, and confirm local radio approval requirements. Many sites also require induction and an approved-equipment check at the gate, so allow time for that.

What does the refinery's lubricant and gas role mean for hazard types?

Lubricant plants and gas processing mean both flammable liquids and flammable gases can occur, sometimes with hydrocarbon vapours near ambient temperature. Ask the operator for the applicable gas groups; do not assume one device rating covers every unit.

Will the 2026 shutdowns affect when I should order?

Maintenance shutdowns of the coking and hydrotreating units are scheduled in 2026, which brings large contractor numbers into classified areas. Plan lead times early. Certification is in progress, so confirm schedules and requirements with the site operator and its HSE team.

Enquiry · Duque de Caxias

Ask about the IS-04Z1 for Duque de Caxias, Brazil

Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.

Enquiry · Duque de Caxias

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Duque de Caxias?

Send the zone and gas group of your site and we will reply with the datasheet and schedule.