Investment programme
Petrobras plans US$4.6 billion for Reduc in 2026-2030, with maintenance shutdowns of the coking and hydrotreating units scheduled in 2026.
Duque de Caxias is an industrial municipality on Guanabara Bay about 17 km from downtown Rio de Janeiro. The Duque de Caxias refinery complex covers about 13 square kilometres beside Rodovia Washington Luis in the Campos Eliseos district, making it a very large industrial site inside the Rio de Janeiro metropolitan area. An ATEX and IECEx mobile phone distributor in Duque de Caxias would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Duque de Caxias has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Duque de Caxias: Loading and dispatch areas, Biofuel (SAF and renewable diesel) processing, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Duque de Caxias. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Petrobras plans US$4.6 billion for Reduc in 2026-2030, with maintenance shutdowns of the coking and hydrotreating units scheduled in 2026.
The refinery sits in the dense Rio metropolitan area with road links to the city and airport.
Reduc sells about 55 different products, the most of any Petrobras refinery, from diesel, jet fuel and asphalt to LPG, paraffins, lubricants, coke and sulphur, so many hazardous product streams are handled on site.
Petrobras has installed a reverse osmosis system supplied by SETA to treat and reuse refinery effluents, an example of the water-management projects that run alongside normal operations.
Reduc began operating in 1961 near Rio de Janeiro, one of the early refineries built after Petrobras was created in 1953 with a legal monopoly.
The Reduc delayed coking unit started operating in July 2008 after an investment of about one billion dollars, converting heavy feedstock into diesel and naphtha and producing petroleum coke.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Duque de Caxias. At the Reduc refinery in Duque de Caxias, reviewers will want certificate evidence that fits Brazil's Inmetro-accredited route. A dual ATEX and IECEx route is designed to help international contractors on the investment programme. The IS-04Z1 has no certificate yet; this is in progress.
A distributor for Duque de Caxias would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are refinery process units, tank farms and pipelines, loading and dispatch areas, biofuel (saf and renewable diesel) processing. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Duque de Caxias.
Typically choose a device with the right zone, gas group and temperature class, carry its certificate, and confirm local radio approval requirements. Many sites also require induction and an approved-equipment check at the gate, so allow time for that.
Lubricant plants and gas processing mean both flammable liquids and flammable gases can occur, sometimes with hydrocarbon vapours near ambient temperature. Ask the operator for the applicable gas groups; do not assume one device rating covers every unit.
Maintenance shutdowns of the coking and hydrotreating units are scheduled in 2026, which brings large contractor numbers into classified areas. Plan lead times early. Certification is in progress, so confirm schedules and requirements with the site operator and its HSE team.
More on Duque de Caxias, and on other places in Brazil.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.