Environment
Hot, humid marine setting with salt-laden air; the island is also a turtle and seabird breeding site, so environmental rules apply.
Crude oil and LNG leave by tanker to markets as far away as Japan and Europe, so jetty and loading-arm areas are busy marine work zones. Gas processing, storage and tanker loading create classified areas across the island. Distribution partners for Das Island are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Das Island has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Das Island: Crude and LNG tanker loading, Pipelines to Habshan, Gas processing trains | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Das Island. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Hot, humid marine setting with salt-laden air; the island is also a turtle and seabird breeding site, so environmental rules apply.
About 6,000 oil and gas personnel live on the island on a rotational schedule, so access is under operator control.
LNG trains T1 and T2 started in 1977 and T3 in 1994, with a combined capacity of about 5.7 million tonnes a year, so equipment ranges from older to newer units.
UAE phones are type-approved by the Telecommunications and Digital Government Regulatory Authority, and the supplier register must be valid for a certificate to be issued.
Abu Dhabi's first offshore platform was installed at Umm Shaif in 1958, and Das Island was turned into the base for those offshore operations.
Das Island airport is the only airport on the island, and about 6,000 rotating staff arrive by air or sea, so travel is tied to the operator's schedules.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Das Island. The island's classified areas arise from gas processing trains, LNG trains, crude and LNG tanker loading and the pipelines to Habshan. ADNOC Gas, as operator, owns the classification and the drawings. SAMS does not classify any area, so a specifier relies on ADNOC Gas for which zone applies where.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Das Island yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are gas processing trains, lng trains, crude and lng tanker loading, pipelines to habshan. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Das Island.
No. Two LNG trains date from 1977 and a third from 1994, and the island has been extended since, including a 2016 southern addition. Older and newer areas may have different area classification and equipment standards, so ask for the drawings.
Radio equipment supplied into the UAE normally needs approval from the Telecommunications and Digital Government Regulatory Authority, with a valid supplier register. Offshore and island sites may also restrict wireless devices, so confirm both with your importer and the operator.
Access is by air and sea under operator control, and ADNOC Gas controls equipment approval and contractor registration for the island. A device would need to meet its requirements before use. Ask ADNOC Gas's procurement and HSE teams about registration, approval and shipping.
More on Das Island, and on other places in United Arab Emirates.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.