Pipeline link
Two pipelines of over 200 km, part of the Integrated Gas Development project, link Das Island with the Habshan complex on the mainland.
Das Island lies in the Arabian Gulf about 160 km off the UAE mainland, and ADNOC Gas operates five gas processing trains and three dedicated LNG trains there. Abu Dhabi's first offshore platform was installed at Umm Shaif in 1958, and Das Island was turned into the base for those offshore operations. Distribution partners for Das Island are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Das Island has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Das Island: Crude and LNG tanker loading, Pipelines to Habshan, Gas processing trains | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Das Island. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Two pipelines of over 200 km, part of the Integrated Gas Development project, link Das Island with the Habshan complex on the mainland.
Hot, humid marine setting with salt-laden air; the island is also a turtle and seabird breeding site, so environmental rules apply.
UAE phones are type-approved by the Telecommunications and Digital Government Regulatory Authority, and the supplier register must be valid for a certificate to be issued.
Das Island airport is the only airport on the island, and about 6,000 rotating staff arrive by air or sea, so travel is tied to the operator's schedules.
The first export cargo of crude oil from Abu Dhabi left Das Island on 4 July 1962, which makes it one of the oldest oil export sites in the Emirates.
The island measures only about 1.2 km by 2.4 km, so process plant, accommodation and the airport share very limited space.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Das Island. Das Island is run by ADNOC Gas, so a reviewer would expect certificate numbers, markings and schedules of conditions for devices entering gas processing and LNG train areas. A dual ATEX and IECEx route helps contractors who move between island, mainland and international projects. The IS-04Z1 certification is in progress and no certificate exists.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Das Island yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are gas processing trains, lng trains, crude and lng tanker loading, pipelines to habshan. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Das Island.
No. Two LNG trains date from 1977 and a third from 1994, and the island has been extended since, including a 2016 southern addition. Older and newer areas may have different area classification and equipment standards, so ask for the drawings.
Radio equipment supplied into the UAE normally needs approval from the Telecommunications and Digital Government Regulatory Authority, with a valid supplier register. Offshore and island sites may also restrict wireless devices, so confirm both with your importer and the operator.
Access is by air and sea under operator control, and ADNOC Gas controls equipment approval and contractor registration for the island. A device would need to meet its requirements before use. Ask ADNOC Gas's procurement and HSE teams about registration, approval and shipping.
More on Das Island, and on other places in United Arab Emirates.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.