Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Umm Al Nar Refinery · ATEX and IECEx

ATEX and IECEx Mobile Phone Distributor in Umm Al Nar Refinery

Umm Al Nar Island in Abu Dhabi hosted the UAE's first refinery, inaugurated in 1976, which processed up to 85,000 barrels a day at its peak. The protected archaeological site is fenced by a concrete wall of about 1,760 m, and it lies between a refinery and a sensitive military area, so works near it face heritage constraints. Distribution partners for Umm Al Nar (former ADNOC refinery) are being identified ahead of the Q4 2026 launch of the IS-04Z1.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Umm Al Nar Refinery, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicATEX and IECEx
DeviceMobile Phone
RouteDistribution
WhereUmm Al Nar Refinery

Short answer. Umm Al Nar (former ADNOC refinery) has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.

Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.

At a glance · ATEX and IECEx

Checklist: ATEX and IECEx mobile phone for Umm Al Nar (former ADNOC refinery)

What to check, and where the IS-04Z1 stands today
CheckWhat to look forIS-04Z1 today
MarkingII 2 G Ex ib IIC T4 on the rating plateDesign target; not yet marked
EU-type examination certificateNotified body number and certificate IDIn progress with TÜV; not issued
IECEx certificate of conformityNumber listed on the IECEx online registerIn progress; not issued
Where it appliesUmm Al Nar (former ADNOC refinery): Decommissioned refinery process units (former), Site clearance and demolition works, Relocated process units being reassembled elsewhere in the UAEClassified by the site operator
Product · Umm Al Nar Refinery

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Umm Al Nar Refinery. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The site · Umm Al Nar (former ADNOC refinery)

Umm Al Nar (former ADNOC refinery): where the IS-04Z1 would work

Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.

Operators and companies on site

  • ADNOC

Classified areas to expect

  • Decommissioned refinery process units (former)
  • Site clearance and demolition works
  • Relocated process units being reassembled elsewhere in the UAE
Local conditions · Umm Al Nar (former ADNOC refinery)

Conditions in Umm Al Nar (former ADNOC refinery) that affect handheld equipment

Equipment reused elsewhere

ADNOC says the refinery's processing units are being refurbished and reassembled at a location within the UAE, where more than 240 specialist staff will be employed.

Where hazardous-area demand sits

ADNOC says its downstream strategy is focused on the Ruwais refining and petrochemical complex, so buyers targeting refinery work should look there rather than at Umm Al Nar.

Field notes · Umm Al Nar (former ADNOC refinery)

More about Umm Al Nar (former ADNOC refinery) that matters for portable equipment

Umm Al Nar (former ADNOC refinery): projects and investment

The Department of Culture and Tourism Abu Dhabi has run three seasons of fieldwork at the island since 2020, so archaeology and industrial clearance can overlap in time.

Umm Al Nar (former ADNOC refinery): background

The island gave its name to the Umm Al Nar Bronze Age culture of about 2600 to 2000 BCE, so it is better known archaeologically than as a refinery site.

Umm Al Nar (former ADNOC refinery): infrastructure

Access to the island is across a bridge and is restricted to pass holders, so any clearance or demolition crews need site passes arranged in advance.

Umm Al Nar (former ADNOC refinery): geography and layout

Umm Al Nar island lies next to the city of Abu Dhabi and has been enlarged by land reclamation and dredging, so the current shoreline differs from the original.

The term · ATEX and IECEx

What “ATEX and IECEx” means for a smartphone

ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.

For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.

In Umm Al Nar (former ADNOC refinery). A reviewer for ADNOC or one of its contractors would expect certificate evidence tied to the exact equipment model, not a general statement. Umm Al Nar is now a former refinery, so buyers should first establish which UAE location the reassembled process units serve. A dual ATEX and IECEx route is designed to suit contractors moving between sites.

The route · distribution

Distributing the IS-04Z1 in Umm Al Nar Refinery

SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Umm Al Nar (former ADNOC refinery) yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.

What SAMS looks for in a partner

Operator relationships
Existing supplier registrations or a clear route to them with the main operators and contractors in Umm Al Nar (former ADNOC refinery).
Ex-competent staff
People who understand zone classification, markings and the conditions of a certificate.

And equally important

Local-language support
Documentation, training and helpdesk in the languages the workforce uses.
Service capability
Spares, battery replacement and repair routed through SAMS-approved channels.
Questions · Umm Al Nar Refinery

Frequently asked questions

Can we buy an ATEX and IECEx mobile phone in Umm Al Nar Refinery today?

Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.

What does an ATEX and IECEx mobile phone in Umm Al Nar Refinery cost?

SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.

Is the IS-04Z1 ATEX and IECEx certified?

Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.

Which areas at Umm Al Nar (former ADNOC refinery) would use it?

Likely candidates are decommissioned refinery process units (former), site clearance and demolition works, relocated process units being reassembled elsewhere in the uae. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.

How do I become a SAMS distributor for Umm Al Nar (former ADNOC refinery)?

Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Umm Al Nar (former ADNOC refinery).

Do heritage rules affect demolition or clearance works there?

The archaeological site is protected and fenced by a concrete wall of about 1,760 m, and archaeological fieldwork has continued since 2020. Works near it typically need approval and exclusion zones; confirm requirements with the site owner and the authority responsible for heritage.

Where is similar refinery work happening in Abu Dhabi now?

Refining is concentrated at Ruwais, about 240 km west of the city, where process units, tank farms and jetties operate. For equipment buyers, Ruwais is the relevant site, while the older Umm Al Nar island is mostly a decommissioned and heritage-sensitive location.

Where should a buyer look for current ADNOC refinery demand?

ADNOC describes its downstream refining and petrochemicals as concentrated at Ruwais in the Al Dhafra region, and refinery units from Umm Al Nar are being reassembled at another UAE location. A buyer should ask the relevant ADNOC contractor which site the equipment will serve before specifying anything.

Enquiry · Umm Al Nar (former ADNOC refinery)

Ask about the IS-04Z1 for Umm Al Nar (former ADNOC refinery), United Arab Emirates

Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.

Enquiry · Umm Al Nar (former ADNOC refinery)

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Umm Al Nar Refinery?

Send the zone and gas group of your site and we will reply with the datasheet and schedule.