Closed in 2022
ADNOC states the refinery was shut down with zero flaring in 2022, and the land has since been repurposed to suit Abu Dhabi's future needs.
Umm Al Nar Island in Abu Dhabi hosted the UAE's first refinery, inaugurated in 1976, which processed up to 85,000 barrels a day at its peak. ADNOC shut it in 2022 and focused its downstream refining and petrochemicals strategy on Ruwais, so current Zone 1 work is elsewhere. A rugged mobile phone distributor in Umm Al Nar (former ADNOC refinery) would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Umm Al Nar (former ADNOC refinery) has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP65 to IP68 sealing | IP68 design |
| Drop and shock | A stated drop height onto concrete | Specification on request |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Umm Al Nar (former ADNOC refinery): Decommissioned refinery process units (former), Site clearance and demolition works, Relocated process units being reassembled elsewhere in the UAE | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Umm Al Nar Refinery. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
ADNOC states the refinery was shut down with zero flaring in 2022, and the land has since been repurposed to suit Abu Dhabi's future needs.
ADNOC says the refinery's processing units are being refurbished and reassembled at a location within the UAE, where more than 240 specialist staff will be employed.
The Department of Culture and Tourism Abu Dhabi has run three seasons of fieldwork at the island since 2020, so archaeology and industrial clearance can overlap in time.
The island gave its name to the Umm Al Nar Bronze Age culture of about 2600 to 2000 BCE, so it is better known archaeologically than as a refinery site.
The protected archaeological site is fenced by a concrete wall of about 1,760 m, and it lies between a refinery and a sensitive military area, so works near it face heritage constraints.
Access to the island is across a bridge and is restricted to pass holders, so any clearance or demolition crews need site passes arranged in advance.
A rugged phone is built to survive water, dust, drops and rough handling, usually rated by an IP code and a drop specification. Ruggedness is an environmental property: it says nothing about whether a phone may be used where flammable gas or dust is present. That is decided by explosion-protection certification and marking.
The IS-04Z1 combines both: an IP68 sealed rugged build and a design for Zone 1 and Zone 21 (marking target Ex ib IIC T4). The explosion-protection certificates are in progress and none has been issued.
In Umm Al Nar (former ADNOC refinery). Umm Al Nar is a coastal island near Abu Dhabi, so hot weather, dust and salt-laden air are the general concerns during open-air clearance. An IP68 rating addresses dust and water ingress and helps with washdown, but it says nothing about ignition protection, which depends on the certification route still in progress.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Umm Al Nar (former ADNOC refinery). Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
It is designed to IP68 sealing, with glove-friendly controls. Ruggedness is not explosion protection: that depends on the certificates, which are in progress.
Likely candidates are decommissioned refinery process units (former), site clearance and demolition works, relocated process units being reassembled elsewhere in the uae. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Umm Al Nar (former ADNOC refinery).
The archaeological site is protected and fenced by a concrete wall of about 1,760 m, and archaeological fieldwork has continued since 2020. Works near it typically need approval and exclusion zones; confirm requirements with the site owner and the authority responsible for heritage.
Refining is concentrated at Ruwais, about 240 km west of the city, where process units, tank farms and jetties operate. For equipment buyers, Ruwais is the relevant site, while the older Umm Al Nar island is mostly a decommissioned and heritage-sensitive location.
ADNOC describes its downstream refining and petrochemicals as concentrated at Ruwais in the Al Dhafra region, and refinery units from Umm Al Nar are being reassembled at another UAE location. A buyer should ask the relevant ADNOC contractor which site the equipment will serve before specifying anything.
Other guides for Umm Al Nar Refinery, other places in United Arab Emirates, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Name the site and the operator and we will send what is available before launch.