Further construction
Petrobras has announced base-oil, diesel and jet fuel units for the complex and a link with Reduc; these are plans, so work may be under construction.
The Boaventura Energy Complex at Itaborai, Rio de Janeiro state, is the former Comperj petrochemical project. Itaborai is linked to Sao Goncalo and Niteroi by the Niteroi-Manilha highway, and most drivers heading west use the Sao Goncalo, Niteroi and Rio de Janeiro route rather than the Baixada Fluminense roads. Distribution partners for Itaborai (Boaventura Energy Complex, formerly Comperj) are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Itaborai (Boaventura Energy Complex, formerly Comperj) has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Itaborai (Boaventura Energy Complex, formerly Comperj): LPG and C5+ product handling, Planned refining and lubricant units, Natural gas processing unit | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Itaborai Petrochemical. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Petrobras has announced base-oil, diesel and jet fuel units for the complex and a link with Reduc; these are plans, so work may be under construction.
Itaborai lies east of Guanabara Bay and is linked to Niteroi by road.
Itaborai has been one of the fastest-growing economies in the Rio de Janeiro metropolitan area since the mid-2000s, linked to the chemical and petroleum industries and related construction.
Comperj's refining unit has a processing capacity of 165,000 barrels of oil a day, and it was initially planned to run heavy oil from the Marlim field in the Campos Basin.
Original plans described two refineries and a petrochemical plant with a 2.8 billion pound per year ethylene unit, polyethylene at 960,000 t/y and polypropylene at 900,000 t/y, plus an aromatics area.
Part of the 19,508 hectare Bacia do Rio Macacu protection area and the Guanabara Ecological Station lie within the municipality, so environmental permitting is a standing factor for site work.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Itaborai (Boaventura Energy Complex, formerly Comperj). A site that is both operating and under construction mixes plant operators with large construction crews, so fleet control matters. EMM or MDM enrolment gives each team the right apps, and charging belongs in safe areas. Itaborai lies east of Guanabara Bay, linked to Niteroi by road.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Itaborai (Boaventura Energy Complex, formerly Comperj). Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are natural gas processing unit, gas pipeline receiving area, lpg and c5+ product handling, planned refining and lubricant units. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Itaborai (Boaventura Energy Complex, formerly Comperj).
Project listings show the complex has changed scope and name more than once, and published information is dated. Treat any schedule as indicative and confirm current status, contractors and induction requirements with Petrobras or its main contractors before planning equipment.
By road via the Niteroi-Manilha highway and the Sao Goncalo to Rio route, with Rio's airport relatively close. Construction-era sites often run staff buses and gate inductions, so confirm transport and device carry rules with the contractor.
The sheet treats the base-oil, diesel and jet fuel units as plans, so work may be under construction and classification may not be final. Ask Petrobras what applies to each unit. Confirm documentation requirements with the site operator and its HSE team.
More on Itaborai Petrochemical, and on other places in Brazil.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.