Macae shore base
People and supplies are largely handled through Macae, which has an airport used for offshore flights and the Imbetiba port.
The Campos Basin is an offshore oil province off Rio de Janeiro and Espirito Santo states, covering about 115,000 square kilometres. Offshore exploration began in 1968 and the first well was drilled in 1971; the Garoupa field was found in 1974 and the first production came from Enchova in 1977 at 124 m of water. An ATEX and IECEx mobile phone distributor in Campos Basin would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Campos Basin has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Campos Basin: Crude storage and offloading, Gas compression, Platform process modules | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Campos Basin. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
People and supplies are largely handled through Macae, which has an airport used for offshore flights and the Imbetiba port.
Salt, humidity and heat are normal, so equipment is commonly checked onshore before it goes offshore.
Production comes from varied reservoir types, including turbidite sandstones, fractured basalts, coquinas and limestones, which leads to a mix of facility designs and well services across the basin.
Roncador ranked first among the top fields of the Santos, Campos and Espirito Santo basins in 2010 at 129.7 million barrels of oil equivalent, and the Campos Basin had eight discoveries in 2011.
In 2020 Petrobras sold shallow-water concessions including Enchova, Bicudo, Bonito, Pampo and Badejo to Trident Energy, so the operator mix in older shallow fields has diversified.
In 2014 about 62.7 percent of Petrobras' Brazilian proved developed reserves were in the Campos Basin, and the company set its basin headquarters in Macae in the 1970s.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Campos Basin. On Campos Basin platforms, where Petrobras, Prio, Shell, Trident Energy, Brava Energia and Perenco operate, reviewers expect certificate evidence before devices go offshore, and equipment is commonly checked onshore. A dual ATEX and IECEx route is designed to help international service firms. The IS-04Z1 has no certificate yet.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Campos Basin yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are platform process modules, wellhead areas, crude storage and offloading, gas compression. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Campos Basin.
Macae hosts Petrobras' basin base, an airport with offshore helicopter operations and over 4,000 companies set up in the city. That concentration makes it the usual staging point for spares and servicing. Confirm freight, customs and storage arrangements with your local contractor.
Mostly by helicopter from the Macae area, with some supply by sea. Fields lie 50 to 140 km offshore, so transfers are weather dependent. Confirm helicopter operator rules about batteries and powered devices, and ask whether your equipment must be stowed or certified for the aircraft.
Largely at Macae, which handles people and supplies for the basin and has the Imbetiba port and an airport used for offshore flights. Equipment is commonly checked onshore first. Confirm approvals, documentation and delivery routes with the operator and its contractors.
Related guides for Campos Basin and for Brazil.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.