Pre-salt gas
The site receives rich gas that is processed into natural gas, LPG and C5+ for the petrochemical and fuel markets.
The Boaventura Energy Complex at Itaborai, Rio de Janeiro state, is the former Comperj petrochemical project. Its gas processing unit, fed by the 355 km Rota 3 pipeline from the Santos Basin pre-salt, has operated commercially since November 2024 and reached 21 million cubic metres a day of capacity with a second train in May 2025. A rugged mobile phone distributor in Itaborai (Boaventura Energy Complex, formerly Comperj) would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Itaborai (Boaventura Energy Complex, formerly Comperj) has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP65 to IP68 sealing | IP68 design |
| Drop and shock | A stated drop height onto concrete | Specification on request |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Itaborai (Boaventura Energy Complex, formerly Comperj): LPG and C5+ product handling, Planned refining and lubricant units, Natural gas processing unit | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Itaborai Petrochemical. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
The site receives rich gas that is processed into natural gas, LPG and C5+ for the petrochemical and fuel markets.
Petrobras has announced base-oil, diesel and jet fuel units for the complex and a link with Reduc; these are plans, so work may be under construction.
Itaborai has been one of the fastest-growing economies in the Rio de Janeiro metropolitan area since the mid-2000s, linked to the chemical and petroleum industries and related construction.
Comperj's refining unit has a processing capacity of 165,000 barrels of oil a day, and it was initially planned to run heavy oil from the Marlim field in the Campos Basin.
Original plans described two refineries and a petrochemical plant with a 2.8 billion pound per year ethylene unit, polyethylene at 960,000 t/y and polypropylene at 900,000 t/y, plus an aromatics area.
Part of the 19,508 hectare Bacia do Rio Macacu protection area and the Guanabara Ecological Station lie within the municipality, so environmental permitting is a standing factor for site work.
A rugged phone is built to survive water, dust, drops and rough handling, usually rated by an IP code and a drop specification. Ruggedness is an environmental property: it says nothing about whether a phone may be used where flammable gas or dust is present. That is decided by explosion-protection certification and marking.
The IS-04Z1 combines both: an IP68 sealed rugged build and a design for Zone 1 and Zone 21 (marking target Ex ib IIC T4). The explosion-protection certificates are in progress and none has been issued.
In Itaborai (Boaventura Energy Complex, formerly Comperj). Itaborai is in the Rio hinterland, with outdoor pipework and process equipment exposed to sun, rain and dust. IP68 helps handsets survive such conditions. It does not provide explosion protection, which is a separate property shown by the Ex marking.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Itaborai (Boaventura Energy Complex, formerly Comperj). Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
It is designed to IP68 sealing, with glove-friendly controls. Ruggedness is not explosion protection: that depends on the certificates, which are in progress.
Likely candidates are natural gas processing unit, gas pipeline receiving area, lpg and c5+ product handling, planned refining and lubricant units. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Itaborai (Boaventura Energy Complex, formerly Comperj).
Project listings show the complex has changed scope and name more than once, and published information is dated. Treat any schedule as indicative and confirm current status, contractors and induction requirements with Petrobras or its main contractors before planning equipment.
By road via the Niteroi-Manilha highway and the Sao Goncalo to Rio route, with Rio's airport relatively close. Construction-era sites often run staff buses and gate inductions, so confirm transport and device carry rules with the contractor.
The sheet treats the base-oil, diesel and jet fuel units as plans, so work may be under construction and classification may not be final. Ask Petrobras what applies to each unit. Confirm documentation requirements with the site operator and its HSE team.
Related guides for Itaborai Petrochemical and for Brazil.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.