Turnaround cycles
Planned maintenance shutdowns bring large contractor workforces into classified areas; Reduc, for example, has shutdowns scheduled in 2026.
This is a regional grouping rather than a single site. Of eight refineries once offered for sale, only two were sold (Mataripe and the Manaus refinery), and Petrobras later resumed investing in the rest of its refining park. Distribution partners for Brazilian refineries are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Brazilian refineries has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Brazilian refineries: Crude and product tank farms, Loading racks and jetties, Hydrotreater and hydrogen units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Brazil Refineries. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Planned maintenance shutdowns bring large contractor workforces into classified areas; Reduc, for example, has shutdowns scheduled in 2026.
Petrobras has sold some refineries (for example RLAM in Bahia and Reman in Manaus), so procurement rules differ by owner.
Revamp projects are under way at the Presidente Bernardes (RPBC), Paulinia (Replan) and Duque de Caxias (Reduc) refineries, with hydroprocessing units planned at Revap and Refap.
Under the Strategic Plan 2024-28+ Petrobras budgets 16.7 billion US dollars across refining, transport and marketing, with 9 billion dollars earmarked for refining, which implies a long pipeline of shutdown and revamp work.
Petrobras' REPLAN refinery at Paulinia, Sao Paulo, is the largest in Brazil at 434,000 barrels per day, and the 208,000 b/d REPAR refinery at Araucaria, Parana, is another major site in the 2024-28 plan.
Regap has a photovoltaic plant of 13,300 kW with about 20,000 solar panels, the first at a Petrobras refinery, and Petrobras plans 55.5 MW of solar capacity across its refining sites.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Brazilian refineries. Refineries lie in the south-east, south, north-east and elsewhere, so logistics differ by site, and ownership changes mean different procurement rules. Contractors bring their own fleets, so MDM or EMM enrolment is useful. Charging happens in safe areas, and radio coverage should be checked per plant.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Brazilian refineries. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are refinery process units, crude and product tank farms, loading racks and jetties, hydrotreater and hydrogen units. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Brazilian refineries.
Process units, pump areas, tank farms, loading racks and sample points commonly contain Zone 1 or Zone 2 gas areas, often gas group IIA or IIB with hydrogen areas in IIC. The refinery's area classification drawings are the authority, so request them before specifying handheld devices.
Current plans point to Replan, Repar, Regap, Reduc, RPBC and Abreu e Lima, with revamps, hydroprocessing and sustainable fuels projects announced. Timelines can shift, so treat them as indicative and confirm scope and schedule with the operator or its main contractors.
No. Petrobras has sold some refineries, for example RLAM in Bahia and Reman in Manaus, so procurement rules differ by owner. Purchasing is usually through registered-supplier processes. Confirm equipment approval and documentation requirements with the site operator and its HSE team.
More on Brazil Refineries, and on other places in Brazil.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.