Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Brazil Refineries · Ex-proof

Ex-Proof Mobile Phone in Brazil Refineries

Regap has a photovoltaic plant of 13,300 kW with about 20,000 solar panels, the first at a Petrobras refinery, and Petrobras plans 55.5 MW of solar capacity across its refining sites. Petrobras operates about ten refineries in Brazil, including Replan at Paulinia (415,000 barrels a day), Revap at Sao Jose dos Campos and Reduc at Duque de Caxias, each with classified process, storage and loading areas. This page explains what to look for in an Ex-proof mobile phone for Brazilian refineries, and where the IS-04Z1 stands against that list today.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Brazil Refineries, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicEx-proof
DeviceMobile Phone
RouteSpecification
WhereBrazil Refineries

Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Brazilian refineries: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.

Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.

At a glance · Ex-proof

Checklist: Ex-proof mobile phone for Brazilian refineries

Specification checklist against the IS-04Z1 today
CheckWhat to look forIS-04Z1 today
Ex markingGroup, category, protection concept, gas group, temperature classII 2 G Ex ib IIC T4 (target)
Gas groupIIA, IIB or IIC matched to the area drawingIIC (target)
Temperature classT-class below the ignition temperature of the gasT4, 135 °C (target)
Where it appliesBrazilian refineries: Crude and product tank farms, Loading racks and jetties, Hydrotreater and hydrogen unitsClassified by the site operator
Product · Brazil Refineries

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Brazil Refineries. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The site · Brazilian refineries

Brazilian refineries: where the IS-04Z1 would work

Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.

Operators and companies on site

  • Petrobras

Classified areas to expect

  • Crude and product tank farms
  • Loading racks and jetties
  • Hydrotreater and hydrogen units
  • Flare and wastewater areas
Local conditions · Brazilian refineries

Conditions in Brazilian refineries that affect handheld equipment

Ownership has changed

Petrobras has sold some refineries (for example RLAM in Bahia and Reman in Manaus), so procurement rules differ by owner.

Spread across regions

Refineries sit in the south-east, south, north-east and elsewhere, so logistics differ by site.

Field notes · Brazilian refineries

More about Brazilian refineries that matters for portable equipment

Brazilian refineries: projects and investment

Revamp projects are under way at the Presidente Bernardes (RPBC), Paulinia (Replan) and Duque de Caxias (Reduc) refineries, with hydroprocessing units planned at Revap and Refap.

Brazilian refineries: projects and investment

Under the Strategic Plan 2024-28+ Petrobras budgets 16.7 billion US dollars across refining, transport and marketing, with 9 billion dollars earmarked for refining, which implies a long pipeline of shutdown and revamp work.

Brazilian refineries: who works there

Petrobras' REPLAN refinery at Paulinia, Sao Paulo, is the largest in Brazil at 434,000 barrels per day, and the 208,000 b/d REPAR refinery at Araucaria, Parana, is another major site in the 2024-28 plan.

Brazilian refineries: projects and investment

At the Gabriel Passos refinery (Regap) in Betim, Minas Gerais, capacity of 166,000 b/d is being raised by 25,000 b/d with start-up planned for 2027, and sustainable aviation fuel production is being introduced.

The term · Ex-proof

What “Ex-proof” means for a smartphone

“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.

The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.

In Brazilian refineries. A marking check at a hydrotreater or hydrogen unit differs from one at a product tank farm, since gas group and temperature class follow the product. Reviewers compare the label with the site's classification drawings. The IS-04Z1 marking target II 2 G Ex ib IIC T4 is not a certificate.

The route · specification

Specifying an Ex-proof mobile phone for Brazil Refineries

A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.

Check on the paper

Marking
Equipment group, category, protection concept, gas group and temperature class, matched to the area drawing.
Certificate and schedule
A certificate number, issuing body and the schedule of conditions, not a brochure claim.
Standards edition
The IEC 60079 or national standard edition the certificate was issued against.

Check for the IS-04Z1

Marking target
II 2 G Ex ib IIC T4: a target, not yet a certificate.
Certificate status
IECEx, ATEX, UKEX and NEC 500 in progress; none issued.
Operator approval
Separate from the certificate and handled with the site operator.
Questions · Brazil Refineries

Frequently asked questions

Can we buy an Ex-proof mobile phone in Brazil Refineries today?

Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.

What does an Ex-proof mobile phone in Brazil Refineries cost?

No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.

What Ex marking will the IS-04Z1 carry?

The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.

Which areas at Brazilian refineries would use it?

Likely candidates are refinery process units, crude and product tank farms, loading racks and jetties, hydrotreater and hydrogen units. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.

Is intrinsically safe the same as explosion proof?

Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.

How are devices usually approved for Petrobras refineries?

Refinery contractors typically check Ex certification marking, temperature class and gas group against the area classification, plus local radio approval. The detail varies by site and contractor, so confirm the requirement with the refinery safety group and your contractor induction pack.

Do refinery turnarounds change the device requirements?

Often. During shutdowns and revamps, work shifts between live and isolated units, and permits define which areas are gas-tested. Many sites keep the same Ex requirement for the whole fence line to avoid errors, so confirm with the operator and the turnaround contractor.

When is the best time to deploy handsets at a refinery?

Maintenance shutdowns are a natural point, because large contractor workforces enter classified areas, and Reduc has shutdowns scheduled in 2026. Plan MDM enrolment and charging well before mobilisation. Confirm timing and rules with the site operator, as schedules change.

Enquiry · Brazilian refineries

Ask about the IS-04Z1 for Brazilian refineries, Brazil

Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.

Enquiry · Brazilian refineries

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Brazil Refineries?

Send the zone and gas group of your site and we will reply with the datasheet and schedule.