Fuel and gas
Subsidiaries provide fuel storage tank leasing and terminal services (Senoko Services) and gas shipping and retail (Senoko Gas Supply).
The station stands on the site of a former British naval base in Sembawang on Singapore's northern coast, so the shoreline is a mixture of old naval and new industrial land. Classified areas centre on the power station's gas systems and on fuel storage tank leasing and terminal services, not on the whole estate. If you are specifying an IECEx smartphone for Senoko, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Senoko: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Senoko: Power plant gas and fuel systems, Fuel storage tanks and terminal services | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Senoko Industrial Zone. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Subsidiaries provide fuel storage tank leasing and terminal services (Senoko Services) and gas shipping and retail (Senoko Gas Supply).
Senoko Power Station is a combined cycle plant with a licensed capacity of 2,644 MW and supplies about 20 per cent of Singapore's electricity needs, according to its operator.
Its authorised capacity is 2,800 megawatts from seven operating units, and it runs mainly as a combined-cycle gas plant, so gas-turbine halls and fuel systems form its main classified areas.
Natural gas supplies over 90 percent of Singapore's electricity, up from less than 20 percent in 2000, which is why large gas-fired plants such as Senoko dominate the local hazardous-area picture.
Combined-cycle units 6 and 7, rated at 431 megawatts each, were completed by 2012 by repowering the second oil-fired steam stage, while units 3 to 5 at 365 megawatts each followed by 2004.
Natural gas has replaced crude oil as the main fuel since 1992, with fuel oil kept as a back-up, and stage III boilers were modified with gas burners to burn either fuel.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Senoko. Senoko's owners are international groups, so visiting engineers and outage contractors may be used to reading IECEx paperwork. A certificate of conformity with its schedule of conditions is what such a reader would look for. For the IS-04Z1 neither document exists yet, because the IECEx programme is still in progress.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are power plant gas and fuel systems, fuel storage tanks and terminal services. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Combined-cycle units are taken offline for planned inspections, and contractor numbers rise during those windows. Dates are set by the operator and the grid, so ask the plant's maintenance planner about the outage calendar and the approved-equipment list.
Natural gas has been the main fuel since 1992, with fuel oil as a back-up. Gas groups and temperature classes differ between natural gas and oil vapour, so devices should be matched to the gas group and temperature class stated in the plant's area classification.
No. The classified areas are mostly the gas and fuel systems and fuel tanks at the power station, not the estate as a whole. Other tenants have not been checked here. Ask the relevant operator for its classification before assuming a zone, and confirm with the site operator.
More on Senoko Industrial Zone, and on other places in Singapore.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.