Ownership
Senoko Energy lists Marubeni Corporation and Sembcorp Industries as its shareholders.
Senoko is an industrial subzone of Sembawang on Singapore's northern coast, best known for Senoko Power Station. Its authorised capacity is 2,800 megawatts from seven operating units, and it runs mainly as a combined-cycle gas plant, so gas-turbine halls and fuel systems form its main classified areas. Distribution partners for Senoko are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Senoko has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | Senoko: Power plant gas and fuel systems, Fuel storage tanks and terminal services | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Senoko Industrial Zone. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Senoko Energy lists Marubeni Corporation and Sembcorp Industries as its shareholders.
Subsidiaries provide fuel storage tank leasing and terminal services (Senoko Services) and gas shipping and retail (Senoko Gas Supply).
Senoko Power Station is the largest power station in Singapore and was commissioned in 1976, after planning began in the early 1970s under the Public Utilities Board.
Natural gas supplies over 90 percent of Singapore's electricity, up from less than 20 percent in 2000, which is why large gas-fired plants such as Senoko dominate the local hazardous-area picture.
Combined-cycle units 6 and 7, rated at 431 megawatts each, were completed by 2012 by repowering the second oil-fired steam stage, while units 3 to 5 at 365 megawatts each followed by 2004.
The station stands on the site of a former British naval base in Sembawang on Singapore's northern coast, so the shoreline is a mixture of old naval and new industrial land.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In Senoko. Plant rounds through gas receiving, fuel storage and turbine halls are walking inspections with readings, photos and permits to log. A handheld intrinsically safe phone is intended for that routine, if certification is completed and the owner accepts it. Outage periods with many contractors add to the case for a managed device.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Senoko. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
Likely candidates are power plant gas and fuel systems, fuel storage tanks and terminal services. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Senoko.
No. Classified areas are concentrated at the power station's gas systems and at fuel storage, not across the whole industrial zone. Other tenants may have none at all. Ask the specific site for its area classification drawing before choosing equipment.
Typical examples are gas pressure-reduction and metering stations, gas turbine enclosures, fuel oil storage and pump areas, and battery or hydrogen-related rooms. Most are Zone 2 in normal operation, but Zone 1 can occur around specific equipment, so confirm with the plant.
The plant operator runs its own contractor and equipment approvals, and SAMS has no role in them. Send its procurement and HSE teams the IS-04Z1 datasheet and target marking, noting that certification is in progress and no certificate has been issued.
Related guides for Senoko Industrial Zone and for Singapore.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.