Ownership
Senoko Energy lists Marubeni Corporation and Sembcorp Industries as its shareholders.
Senoko is an industrial subzone of Sembawang on Singapore's northern coast, best known for Senoko Power Station. Combined-cycle units 6 and 7, rated at 431 megawatts each, were completed by 2012 by repowering the second oil-fired steam stage, while units 3 to 5 at 365 megawatts each followed by 2004. An industrial mobile phone distributor in Senoko would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Senoko has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Senoko: Power plant gas and fuel systems, Fuel storage tanks and terminal services | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Senoko Industrial Zone. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Senoko Energy lists Marubeni Corporation and Sembcorp Industries as its shareholders.
Subsidiaries provide fuel storage tank leasing and terminal services (Senoko Services) and gas shipping and retail (Senoko Gas Supply).
The station stands on the site of a former British naval base in Sembawang on Singapore's northern coast, so the shoreline is a mixture of old naval and new industrial land.
Natural gas has replaced crude oil as the main fuel since 1992, with fuel oil kept as a back-up, and stage III boilers were modified with gas burners to burn either fuel.
Senoko is best known for two uses, its power station and a fishery port, so large power plant and wholesale seafood handling share the same stretch of Sembawang's northern coastline.
Equatorial heat and humidity, with frequent heavy showers, are constant on this northern coast and affect outdoor switchyards, fuel tanks and gas metering stations.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Senoko. A plant of this scale runs shift crews plus outage contractors, so a shared pool of handhelds under EMM or MDM suits it. Enrolment, app lists and lock-down policies should be set before devices reach site. Charging belongs in a safe area such as a control room, and connectivity rules are the plant's.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Senoko. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are power plant gas and fuel systems, fuel storage tanks and terminal services. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Senoko.
No. Classified areas are concentrated at the power station's gas systems and at fuel storage, not across the whole industrial zone. Other tenants may have none at all. Ask the specific site for its area classification drawing before choosing equipment.
Typical examples are gas pressure-reduction and metering stations, gas turbine enclosures, fuel oil storage and pump areas, and battery or hydrogen-related rooms. Most are Zone 2 in normal operation, but Zone 1 can occur around specific equipment, so confirm with the plant.
The plant operator runs its own contractor and equipment approvals, and SAMS has no role in them. Send its procurement and HSE teams the IS-04Z1 datasheet and target marking, noting that certification is in progress and no certificate has been issued.
Other guides for Senoko Industrial Zone, other places in Singapore, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.