Pre-salt gas
The site receives rich gas that is processed into natural gas, LPG and C5+ for the petrochemical and fuel markets.
The Boaventura Energy Complex at Itaborai, Rio de Janeiro state, is the former Comperj petrochemical project. Its gas processing unit, fed by the 355 km Rota 3 pipeline from the Santos Basin pre-salt, has operated commercially since November 2024 and reached 21 million cubic metres a day of capacity with a second train in May 2025. An IECEx smartphone distributor in Itaborai (Boaventura Energy Complex, formerly Comperj) would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Itaborai (Boaventura Energy Complex, formerly Comperj) has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Itaborai (Boaventura Energy Complex, formerly Comperj): LPG and C5+ product handling, Planned refining and lubricant units, Natural gas processing unit | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Itaborai Petrochemical. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
The site receives rich gas that is processed into natural gas, LPG and C5+ for the petrochemical and fuel markets.
Petrobras has announced base-oil, diesel and jet fuel units for the complex and a link with Reduc; these are plans, so work may be under construction.
Itaborai has been one of the fastest-growing economies in the Rio de Janeiro metropolitan area since the mid-2000s, linked to the chemical and petroleum industries and related construction.
Comperj's refining unit has a processing capacity of 165,000 barrels of oil a day, and it was initially planned to run heavy oil from the Marlim field in the Campos Basin.
Original plans described two refineries and a petrochemical plant with a 2.8 billion pound per year ethylene unit, polyethylene at 960,000 t/y and polypropylene at 900,000 t/y, plus an aromatics area.
Part of the 19,508 hectare Bacia do Rio Macacu protection area and the Guanabara Ecological Station lie within the municipality, so environmental permitting is a standing factor for site work.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Itaborai (Boaventura Energy Complex, formerly Comperj). Further units are announced for the complex, which could bring international engineering contractors to Itaborai. For them IECEx offers a familiar certificate of conformity and schedule of conditions. These are plans, so work may be under construction. The IS-04Z1 IECEx route is in progress.
A distributor for Itaborai (Boaventura Energy Complex, formerly Comperj) would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are natural gas processing unit, gas pipeline receiving area, lpg and c5+ product handling, planned refining and lubricant units. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Itaborai (Boaventura Energy Complex, formerly Comperj).
Project listings show the complex has changed scope and name more than once, and published information is dated. Treat any schedule as indicative and confirm current status, contractors and induction requirements with Petrobras or its main contractors before planning equipment.
By road via the Niteroi-Manilha highway and the Sao Goncalo to Rio route, with Rio's airport relatively close. Construction-era sites often run staff buses and gate inductions, so confirm transport and device carry rules with the contractor.
The sheet treats the base-oil, diesel and jet fuel units as plans, so work may be under construction and classification may not be final. Ask Petrobras what applies to each unit. Confirm documentation requirements with the site operator and its HSE team.
Related guides for Itaborai Petrochemical and for Brazil.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.