Investment programme
Petrobras plans US$4.6 billion for Reduc in 2026-2030, with maintenance shutdowns of the coking and hydrotreating units scheduled in 2026.
Duque de Caxias is an industrial municipality on Guanabara Bay about 17 km from downtown Rio de Janeiro. Reduc began operating in 1961 near Rio de Janeiro, one of the early refineries built after Petrobras was created in 1953 with a legal monopoly. If you are specifying a hazardous area smartphone for Duque de Caxias, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Duque de Caxias: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Duque de Caxias: Refinery process units, Tank farms and pipelines, Loading and dispatch areas | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Duque de Caxias. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Petrobras plans US$4.6 billion for Reduc in 2026-2030, with maintenance shutdowns of the coking and hydrotreating units scheduled in 2026.
The refinery sits in the dense Rio metropolitan area with road links to the city and airport.
Reduc sells about 55 different products, the most of any Petrobras refinery, from diesel, jet fuel and asphalt to LPG, paraffins, lubricants, coke and sulphur, so many hazardous product streams are handled on site.
Petrobras has installed a reverse osmosis system supplied by SETA to treat and reuse refinery effluents, an example of the water-management projects that run alongside normal operations.
The Reduc delayed coking unit started operating in July 2008 after an investment of about one billion dollars, converting heavy feedstock into diesel and naphtha and producing petroleum coke.
A natural-gas power unit of 63 MW has served the refinery since 1976, so the site generates part of its own electricity as well as processing fuels and lubricants.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Duque de Caxias. Reduc has refinery process units, tank farms and pipelines, loading and dispatch areas, and biofuel (SAF and renewable diesel) processing, with Petrobras as operator. Petrobras classifies the areas; SAMS does not. A multi-product site means more than one product and classification may sit side by side.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are refinery process units, tank farms and pipelines, loading and dispatch areas, biofuel (saf and renewable diesel) processing. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Large refineries run planned turnarounds, and Reduc is in Petrobras' revamp programme. Exact dates are set by the operator, so confirm shutdown windows, contractor induction rules and permit-to-work practice before scheduling visits with portable equipment.
Process units, lubricant and gas processing areas, tank farms and loading points commonly contain classified zones. Each area's gas group and temperature class is defined in the refinery's classification drawings, so ask the safety department for them before specifying a handheld device.
Possibly. SAF and renewable diesel processing is a different product stream from the original refinery units, so its area classification may differ. Do not assume one marking fits all. Ask Petrobras for the classification of the exact unit before choosing a device.
Other guides for Duque de Caxias, other places in Brazil, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.