Pipelines
Two pipelines of over 200 km link Habshan with Das Island, and the Habshan-Fujairah crude pipeline starts here.
Habshan, in south-western Abu Dhabi, is ADNOC Gas's largest processing complex, with five plants and 14 processing trains and 6.1 bscfd capacity. The area is a major production centre for sulphur, a by-product of the oil industry, so sulphur handling and dust are part of site conditions. This page explains what to look for in an explosion proof smartphone for Habshan gas complex, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Habshan gas complex: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Protection concept | Flameproof (Ex d) or intrinsic safety (Ex i) | Intrinsic safety, level ib |
| Zone suitability | Zone 1 gas and Zone 21 dust | Design target for Zone 1 and 21 |
| Certificate | Number, issuing body and schedule of conditions | In progress; not issued |
| Where it applies | Habshan gas complex: Gas processing trains, NGL and condensate handling, Sulphur and acid-gas units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Habshan Gas. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Two pipelines of over 200 km link Habshan with Das Island, and the Habshan-Fujairah crude pipeline starts here.
Habshan is the terminal station of the Etihad Rail network, and the site is remote desert with worker camps.
A large part of the Habshan area is marked as a Red Zone because hydrogen sulphide gas is present, so site entry rules and gas-safety practice are a key planning point for any visit.
The Habshan to Fujairah crude pipeline is 406 km long, has a 48-inch diameter and a capacity of 1.5 million barrels a day.
Habshan is the terminal station of the Etihad Rail network, whose commercial operations began in December 2015, giving the site a direct freight rail link.
Habshan is an area in the south-western part of the Emirate of Abu Dhabi that contains oil and gas fields and camps for oil workers.
“Explosion proof” is the phrase most buyers use for equipment that may be taken into a classified hazardous area. Strictly, it covers several protection concepts: a flameproof enclosure (Ex d) contains an internal explosion, while intrinsic safety (Ex i) limits electrical energy so that an ignition cannot start. Phones are normally intrinsically safe, because a flameproof handset would be too heavy to carry all shift.
The IS-04Z1 uses intrinsic safety, with a marking target of Ex ib IIC T4, and is designed for Zone 1 and Zone 21. It is pre-launch, certification is in progress and no certificate has been issued.
In Habshan gas complex. Habshan yields sales gas, NGLs, condensate and sulphur, and explosion-proof is used loosely across all of it. Flameproof Ex d suits fixed compressor and pump equipment, while handheld devices rely on intrinsic safety. Sulphur and acid-gas units add toxic-gas considerations that the operator manages separately.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
It is intrinsically safe (marking target Ex ib IIC T4), which is the usual way to make a phone for hazardous areas. It is not a flameproof (Ex d) design, and certification is still in progress.
Likely candidates are gas processing trains, ngl and condensate handling, sulphur and acid-gas units, gas pipelines. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
About 406 km, with a 48-inch diameter and a capacity of 1.5 million barrels a day, passing east of Abu Dhabi city, through Sweihan and west of Al Ain. Pumping and metering stations along it have their own classified areas, set by the operator.
Yes. As a controlled oil and gas area with worker camps, access is managed by the operator, normally through registered contractors with induction and permit procedures. Confirm current requirements for portable electronic devices and gas detection with the operator's HSE team.
Much of the Habshan area is designated Red Zone because of hydrogen sulphide, so site-specific safety controls apply. These are separate from explosion protection, and are set by ADNOC Gas. Ask the operator what is required for a device and for personnel in those areas.
More on Habshan Gas, and on other places in United Arab Emirates.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Name the site and the operator and we will send what is available before launch.