Expansion plans
Further trains have been proposed as a possible second phase, so construction and commissioning activity may continue.
Gas arrives via the 670 km Coastal GasLink pipeline built by TC Energy, with an initial capacity of about 2.1 billion cubic feet a day and potential expansion to about 5 billion. Gas handling, liquefaction and ship loading create Zone 1 and Zone 2 areas. Distribution partners for LNG Canada, Kitimat are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. LNG Canada, Kitimat has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Protection concept | Flameproof (Ex d) or intrinsic safety (Ex i) | Intrinsic safety, level ib |
| Zone suitability | Zone 1 gas and Zone 21 dust | Design target for Zone 1 and 21 |
| Certificate | Number, issuing body and schedule of conditions | In progress; not issued |
| Where it applies | LNG Canada, Kitimat: Gas receipt from pipeline, Marine loading jetty, LNG liquefaction trains | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Kitimat LNG. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Further trains have been proposed as a possible second phase, so construction and commissioning activity may continue.
The plant produced its first LNG and shipped its first cargo in June 2025; the second train was reported to begin operating in November 2025.
The plant produced its first LNG and shipped its first cargo in June 2025, the second train started in November 2025 and by 23 February 2026 it had shipped 50 cargoes.
The second phase is an 18 billion dollar liquefaction and storage plant in the port of Kitimat, where natural gas is cooled to liquid and stored awaiting shipment.
LNG Canada is a joint venture of Shell (40 percent), Petronas (25), PetroChina (15), Mitsubishi (15) and KOGAS (5), with a total investment estimated at about 40 billion dollars approved on 1 October 2018.
Kitimat was planned and built by Alcan in the 1950s, and Rio Tinto's aluminium smelter is still the main employer; other local activity includes engineering, metal fabrication and imports of methanol and condensate.
“Explosion proof” is the phrase most buyers use for equipment that may be taken into a classified hazardous area. Strictly, it covers several protection concepts: a flameproof enclosure (Ex d) contains an internal explosion, while intrinsic safety (Ex i) limits electrical energy so that an ignition cannot start. Phones are normally intrinsically safe, because a flameproof handset would be too heavy to carry all shift.
The IS-04Z1 uses intrinsic safety, with a marking target of Ex ib IIC T4, and is designed for Zone 1 and Zone 21. It is pre-launch, certification is in progress and no certificate has been issued.
In LNG Canada, Kitimat. At an LNG terminal, explosion-proof can refer to fixed flameproof Ex d equipment on pumps and compressors. A handheld phone uses intrinsic safety instead. Liquefaction trains, LNG storage, gas receipt and the marine loading jetty are different areas, and each should have its own classification record.
A distributor for LNG Canada, Kitimat would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
It is intrinsically safe (marking target Ex ib IIC T4), which is the usual way to make a phone for hazardous areas. It is not a flameproof (Ex d) design, and certification is still in progress.
Likely candidates are lng liquefaction trains, lng storage and loading, gas receipt from pipeline, marine loading jetty. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for LNG Canada, Kitimat.
It shipped its first cargo in June 2025 and a second train started later that year, so work is moving from construction to operations, with expansion discussed. Confirm the current phase and contractor structure with the owners.
JGC Fluor led engineering and construction, and TC Energy built the Coastal GasLink pipeline. Operations contractors now vary, so confirm the current inductions and approved-device lists with LNG Canada's contractor management team.
The plant produced its first LNG and shipped its first cargo in June 2025, and the second train was reported to begin operating in November 2025. Further trains have been proposed as a possible second phase, so construction and commissioning activity may continue. Confirm current status with the project operator.
Related guides for Kitimat LNG and for Canada.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.