Access
About 6,000 oil and gas personnel live on the island on a rotational schedule, so access is under operator control.
Das Island lies in the Arabian Gulf about 160 km off the UAE mainland, and ADNOC Gas operates five gas processing trains and three dedicated LNG trains there. Gas processing, storage and tanker loading create classified areas across the island. An Ex-proof smartphone distributor in Das Island would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Das Island has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ex marking | Group, category, protection concept, gas group, temperature class | II 2 G Ex ib IIC T4 (target) |
| Gas group | IIA, IIB or IIC matched to the area drawing | IIC (target) |
| Temperature class | T-class below the ignition temperature of the gas | T4, 135 °C (target) |
| Where it applies | Das Island: Crude and LNG tanker loading, Pipelines to Habshan, Gas processing trains | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Das Island. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
About 6,000 oil and gas personnel live on the island on a rotational schedule, so access is under operator control.
Two pipelines of over 200 km, part of the Integrated Gas Development project, link Das Island with the Habshan complex on the mainland.
UAE phones are type-approved by the Telecommunications and Digital Government Regulatory Authority, and the supplier register must be valid for a certificate to be issued.
Abu Dhabi's first offshore platform was installed at Umm Shaif in 1958, and Das Island was turned into the base for those offshore operations.
Das Island airport is the only airport on the island, and about 6,000 rotating staff arrive by air or sea, so travel is tied to the operator's schedules.
The first export cargo of crude oil from Abu Dhabi left Das Island on 4 July 1962, which makes it one of the oldest oil export sites in the Emirates.
“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.
The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.
In Das Island. A marking check on Das Island would compare the zone and gas group on the area drawings with the device marking. Gas processing, LNG and crude loading areas may be Zone 1, and gas groups differ by product. The IS-04Z1 target, II 2 G Ex ib IIC T4, is still in progress; ADNOC Gas sets the acceptance criteria.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Das Island yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.
Likely candidates are gas processing trains, lng trains, crude and lng tanker loading, pipelines to habshan. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Das Island.
No. Two LNG trains date from 1977 and a third from 1994, and the island has been extended since, including a 2016 southern addition. Older and newer areas may have different area classification and equipment standards, so ask for the drawings.
Radio equipment supplied into the UAE normally needs approval from the Telecommunications and Digital Government Regulatory Authority, with a valid supplier register. Offshore and island sites may also restrict wireless devices, so confirm both with your importer and the operator.
Access is by air and sea under operator control, and ADNOC Gas controls equipment approval and contractor registration for the island. A device would need to meet its requirements before use. Ask ADNOC Gas's procurement and HSE teams about registration, approval and shipping.
More on Das Island, and on other places in United Arab Emirates.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.