Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
QatarEnergy · ATEX and IECEx

ATEX and IECEx Mobile Phone for QatarEnergy

QatarEnergy is the state-owned national oil and gas company of Qatar, renamed from Qatar Petroleum in 2021. It administers the Ras Laffan and Mesaieed industrial cities and has interests across exploration and production, LNG, refining and petrochemicals. This page explains what to look for in an ATEX and IECEx mobile phone for QatarEnergy, and where the IS-04Z1 stands against that list today.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for QatarEnergy, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicATEX and IECEx
DeviceMobile Phone
RouteSpecification
WhereQatarEnergy

Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for QatarEnergy: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.

Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.

At a glance · ATEX and IECEx

Checklist: ATEX and IECEx mobile phone for QatarEnergy

Checks a reviewer should make, with the IS-04Z1 position
CheckWhat to look forIS-04Z1 today
MarkingII 2 G Ex ib IIC T4 on the rating plateDesign target; not yet marked
EU-type examination certificateNotified body number and certificate IDIn progress with TÜV; not issued
IECEx certificate of conformityNumber listed on the IECEx online registerIn progress; not issued
Where it appliesQatarEnergy: LNG and gas processing, Refinery units, Petrochemical and fertiliser plantsClassified by the site operator
Product · Qatar

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Qatar. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The organisation · QatarEnergy

Working with QatarEnergy (formerly Qatar Petroleum): sites and classified areas

The main sites and the hazardous-area types a portable device is likely to meet at this organisation.

Sites and areas

  • Ras Laffan Industrial City
  • Mesaieed Industrial City
  • Dukhan oil field
  • North Field

Classified areas

  • LNG and gas processing
  • Refinery units
  • Petrochemical and fertiliser plants
  • Onshore oil production
Supplier approval · QatarEnergy

How suppliers reach QatarEnergy

QatarEnergy's Supply Management section describes vendor registration through its Mushtaryat Portal, which issues a SAP Vendor Code required for tender documents, and a Projects Preferred Manufacturers List (PML); confirm current requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.

Field notes · QatarEnergy

More about QatarEnergy that matters for portable equipment

QatarEnergy: background

Qatar took full ownership of the onshore concession in September 1976 and of the offshore concession in February 1977, after a phased nationalisation that began in 1973. The national company dates from 1974.

QatarEnergy: projects and investment

The North Field East expansion, signed as an EPC contract with Chiyoda and Technip in February 2021, was planned to lift LNG export capacity from 77 to 110 million tonnes a year.

QatarEnergy: infrastructure

Two refineries operate: the Umm Said refinery at 137,000 barrels a day, and the Laffan refinery at Ras Laffan, which came on stream in September 2009 on field condensate.

QatarEnergy: logistics and access

Offshore crude is piped to Halul Island for processing and export, while most onshore oil goes to Umm Said (Mesaieed) for refining or export, so tank farms and marine loading are central to its operations.

The term · ATEX and IECEx

What “ATEX and IECEx” means for a smartphone

ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.

For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.

In QatarEnergy. A QatarEnergy procurement or HSE reviewer would expect certificate evidence that names the model and marking, and the sheet describes project-specific Preferred Manufacturers Lists. For Ras Laffan and Mesaieed, where international EPCs and contractors work, a dual ATEX and IECEx route helps comparison. The IS-04Z1 programme is in progress and has no certificate.

The route · specification

Specifying an ATEX and IECEx mobile phone for QatarEnergy

A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.

Check on the paper

Marking
Equipment group, category, protection concept, gas group and temperature class, matched to the area drawing.
Certificate and schedule
A certificate number, issuing body and the schedule of conditions, not a brochure claim.
Standards edition
The IEC 60079 or national standard edition the certificate was issued against.

Check for the IS-04Z1

Marking target
II 2 G Ex ib IIC T4: a target, not yet a certificate.
Certificate status
IECEx, ATEX, UKEX and NEC 500 in progress; none issued.
Operator approval
Separate from the certificate and handled with the site operator.
Questions · QatarEnergy

Frequently asked questions

Can QatarEnergy buy the IS-04Z1 today?

No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.

What does an ATEX and IECEx mobile phone for QatarEnergy cost?

SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.

Is the IS-04Z1 ATEX and IECEx certified?

Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.

How does QatarEnergy approve suppliers?

QatarEnergy's Supply Management section describes vendor registration through its Mushtaryat Portal, which issues a SAP Vendor Code required for tender documents, and a Projects Preferred Manufacturers List (PML); confirm current requirements with its procurement and HSE teams.

Is intrinsically safe the same as explosion proof?

Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.

What should be checked for devices used on offshore Qatari platforms?

Offshore work combines salt air, humidity and summer heat, so check the ingress protection and corrosion resistance of the enclosure, the temperature range and the gas group of the product against the platform's classification. Confirm any marine, helicopter transfer or platform-specific rules with the operator.

Which QatarEnergy sites usually require Zone 1 rated phones and tablets?

Typically the LNG, gas processing and refinery areas at Ras Laffan and Mesaieed, offshore production platforms, and tank farms and loading facilities. Area classification is set by QatarEnergy or its operating companies for each plant, so request the hazardous-area drawing and gas group before choosing equipment.

Do QatarEnergy projects use approved manufacturer lists?

The sheet says QatarEnergy describes project-specific Preferred Manufacturers Lists (PML) alongside vendor registration and a tenders portal. Whether a product appears on a list depends on the project, so confirm with QatarEnergy's procurement and HSE teams. The IS-04Z1 is pre-launch and has no certificate.

Enquiry · QatarEnergy

Ask about the IS-04Z1 for QatarEnergy, Qatar

Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.

Enquiry · QatarEnergy

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for QatarEnergy?

Name the site and the operator and we will send what is available before launch.