QatarEnergy: projects and investment
The North Field East expansion, signed as an EPC contract with Chiyoda and Technip in February 2021, was planned to lift LNG export capacity from 77 to 110 million tonnes a year.
Offshore crude is piped to Halul Island for processing and export, while most onshore oil goes to Umm Said (Mesaieed) for refining or export, so tank farms and marine loading are central to its operations. It administers the Ras Laffan and Mesaieed industrial cities and has interests across exploration and production, LNG, refining and petrochemicals. If you are specifying an IECEx mobile phone for QatarEnergy, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for QatarEnergy: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | QatarEnergy: LNG and gas processing, Refinery units, Petrochemical and fertiliser plants | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Qatar. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Where it operates and the kinds of classified area a handset would meet there.
QatarEnergy's Supply Management section describes vendor registration through its Mushtaryat Portal, which issues a SAP Vendor Code required for tender documents, and a Projects Preferred Manufacturers List (PML); confirm current requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
The North Field East expansion, signed as an EPC contract with Chiyoda and Technip in February 2021, was planned to lift LNG export capacity from 77 to 110 million tonnes a year.
Two refineries operate: the Umm Said refinery at 137,000 barrels a day, and the Laffan refinery at Ras Laffan, which came on stream in September 2009 on field condensate.
QatarEnergy runs all oil and gas activity in the state, from exploration and production through refining, transport and storage, so one organisation sets practice across the whole value chain.
A second phase, North Field South, is planned to raise LNG output to 126 million tonnes a year from 2028, with international partners taking stakes alongside QatarEnergy.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In QatarEnergy. At Ras Laffan Industrial City and Mesaieed Industrial Area, international operators, EPCs and visiting contractors tend to specify to IECEx. A reviewer should read the certificate of conformity with its schedule of conditions. The IS-04Z1 is designed for IECEx, and certification is in progress, so nothing can be supplied as certified.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
QatarEnergy's Supply Management section describes vendor registration through its Mushtaryat Portal, which issues a SAP Vendor Code required for tender documents, and a Projects Preferred Manufacturers List (PML); confirm current requirements with its procurement and HSE teams.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Offshore work combines salt air, humidity and summer heat, so check the ingress protection and corrosion resistance of the enclosure, the temperature range and the gas group of the product against the platform's classification. Confirm any marine, helicopter transfer or platform-specific rules with the operator.
Typically the LNG, gas processing and refinery areas at Ras Laffan and Mesaieed, offshore production platforms, and tank farms and loading facilities. Area classification is set by QatarEnergy or its operating companies for each plant, so request the hazardous-area drawing and gas group before choosing equipment.
The sheet says QatarEnergy describes project-specific Preferred Manufacturers Lists (PML) alongside vendor registration and a tenders portal. Whether a product appears on a list depends on the project, so confirm with QatarEnergy's procurement and HSE teams. The IS-04Z1 is pre-launch and has no certificate.
More on QatarEnergy, and on other places in Qatar.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.