QatarEnergy: background
Qatar took full ownership of the onshore concession in September 1976 and of the offshore concession in February 1977, after a phased nationalisation that began in 1973. The national company dates from 1974.
QatarEnergy is the state-owned national oil and gas company of Qatar, renamed from Qatar Petroleum in 2021. A second phase, North Field South, is planned to raise LNG output to 126 million tonnes a year from 2028, with international partners taking stakes alongside QatarEnergy. Buyers searching for an intrinsically safe mobile phone supplier for QatarEnergy can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An intrinsically safe mobile phone for QatarEnergy cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | QatarEnergy: Petrochemical and fertiliser plants, Onshore oil production, LNG and gas processing | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Qatar. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main sites and the hazardous-area types a portable device is likely to meet at this organisation.
QatarEnergy's Supply Management section describes vendor registration through its Mushtaryat Portal, which issues a SAP Vendor Code required for tender documents, and a Projects Preferred Manufacturers List (PML); confirm current requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
Qatar took full ownership of the onshore concession in September 1976 and of the offshore concession in February 1977, after a phased nationalisation that began in 1973. The national company dates from 1974.
The North Field East expansion, signed as an EPC contract with Chiyoda and Technip in February 2021, was planned to lift LNG export capacity from 77 to 110 million tonnes a year.
Two refineries operate: the Umm Said refinery at 137,000 barrels a day, and the Laffan refinery at Ras Laffan, which came on stream in September 2009 on field condensate.
Offshore crude is piped to Halul Island for processing and export, while most onshore oil goes to Umm Said (Mesaieed) for refining or export, so tank farms and marine loading are central to its operations.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In QatarEnergy. Rounds across LNG, gas processing and refinery units cover large sites, with operators moving between process areas and safe areas. A handheld designed for intrinsic safety could log readings, take photos and place calls close to equipment if the certificate allows. Site access rules and permit regimes at Ras Laffan and Dukhan are QatarEnergy's.
Supply of the IS-04Z1 to QatarEnergy starts only after certification, through authorised distributors. Until then a buyer can request the datasheet and the written certification schedule, and arrange a safe-area evaluation unit, which puts the site on the list for the right local channel at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
QatarEnergy's Supply Management section describes vendor registration through its Mushtaryat Portal, which issues a SAP Vendor Code required for tender documents, and a Projects Preferred Manufacturers List (PML); confirm current requirements with its procurement and HSE teams.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Large expansion projects are usually run through EPC contractors that apply the operator's specifications, so equipment may be approved by the contractor and the operator together. Ask the project team which standards, certificates and vendor lists apply to the work package before ordering.
QatarEnergy is the national company, but many plants are run by subsidiaries and joint ventures such as the LNG, refining and petrochemical operating companies. Each can have its own HSE rules and supplier registration, so confirm requirements with the operating company that controls the site you will visit.
The IS-04Z1 has IP68 dust and water protection and a 4,000 mAh battery. Operating temperature limits will be set by the final certificate and datasheet, so check them against Ras Laffan conditions before use. IP68 is not explosion protection. Confirm the area classification with the site operator.
Other guides for QatarEnergy, other places in Qatar, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.