Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Nigeria · Nigeria LNG

Explosion proof mobile phone for Nigeria LNG in Nigeria

Nigeria LNG runs six liquefaction trains on Bonny Island and is building a seventh. An explosion proof mobile phone for Nigeria LNG has to work across the liquefaction trains, the LNG and LPG storage, the condensate handling and the loading jetties, which is the ground this page covers. The IS-04Z1 is designed around intrinsic safety rather than a flameproof enclosure.

Launching Q4 2026 · certification programme in progress

SAMS IS-04Z1 explosion proof mobile phone, front view
Local approvalIECExIECEx · in progress
AvailabilityQ4 2026via authorised distributors
The site · Bonny Island

Where an explosion proof mobile phone is needed on Bonny Island

The NLNG plant occupies the Finima area of Bonny Island, in Rivers State, where gas arrives by pipeline from the Niger Delta and leaves as LNG, LPG and condensate by ship. The six existing trains give a nameplate of 22 million tonnes a year, and the Train 7 project is intended to take that to about 30 million. Press reports in 2026 put Train 7 above 90 per cent complete, so a handset evaluation now overlaps with a plant that is still being commissioned in one area while the older trains run. The atmospheres are mostly Group IIA: methane, propane and condensate vapour, with refrigerant circuits that typically hold propane and mixed hydrocarbon components. Large flare and relief systems, tank farms and long jetty approaches complete the map. The shareholders are NNPC, Shell, TotalEnergies and Eni, so site rules reflect more than one operator culture.

Shareholders, EPCs and contractors

Nigeria LNG Limited
Operator of the Bonny Island plant.
NNPC Limited
Largest shareholder, with 49 per cent.
Shell, TotalEnergies and Eni
Minority shareholders, at 25.6, 15 and 10.4 per cent.
SCD JV (Saipem, Chiyoda, Daewoo)
The consortium awarded the Train 7 engineering, procurement and construction contract.
Marine and shipping operations
NLNG's own shipping arm and visiting tankers use the jetties.
Bonny Island community and local contractors
Large local workforce, with Nigerian content rules shaping who works where.

Classified units and areas

Liquefaction trains 1 to 6
Gas treatment, cooling and refrigerant compression in each train.
Train 7 construction and commissioning
A construction site turning into a classified process area in stages.
LNG storage tanks
Cryogenic storage, with vapour handling and boil-off gas.
LPG and condensate storage
Propane and butane bullets and spheres, plus condensate tanks.
Flare and relief systems
Areas around flare knock-out drums and seal pots.
Loading jetties and marine terminal
LNG, LPG and condensate loading with ships alongside.
Gas receiving facilities
Inlet separation and pig receivers where pipeline gas arrives.
Administration and control buildings
Safe areas where handsets are issued and charged.
Built for local conditions

What a cryogenic island site does to a handset

At an LNG plant the hazard is predictable and the logistics are not. The handset has to cope with the people more than the gas.

IP ratingIP68
Battery4,000 mAh
Camera50 MP
OSAndroid 16

Heat, humidity and a coastal sun

Bonny Island is a low, wet delta island with year-round heat. The temperature class on the certificate is what an instrumentation engineer checks against the maximum surface temperature the area classification allows, and the marking target for the IS-04Z1 is Ex ib IIC T4.

Rain, mud and construction conditions

Train 7 means active construction beside operating trains, with mud and wet ground. IP68 sealing and rugged build are the design answer to drops and immersion.

Cold surfaces and condensation

LNG pipework and tank bases run very cold, and moving from an air conditioned control room to a wet process area causes condensation. Sealing is meant to keep that out of the handset.

Long walks to safe charging

Between a train, the tank farm and a jetty, the distance to a safe area socket is long. The 4,000 mAh battery is specified to cover a shift with camera, torch and GNSS in use.

Many contractors, one policy

Operating crews, Train 7 contractors and visiting marine staff all pass through. Android Enterprise management from an existing MDM console allows enrolment, app lock and remote wipe for a fleet that changes hands.

Use cases · Bonny Island

Where the IS-04Z1 goes to work at NLNG.

Operations01

Train and utilities rounds

A field operator on a liquefaction train records readings, photographs a gland weep and reports it without leaving the classified area. The photograph and the coordinate go on the work request together.

Commissioning02

Train 7 system completion

Pre-commissioning means walking down punch lists system by system as areas are handed over. A handset that can capture a photograph, a tag and a position helps close items in the field rather than at a desk.

Marine03

Jetty and loading operations

Loading is tied to a ship's arrival window. Jetty operators and cargo surveyors can call, photograph and log from the loading arm area, with the camera policy set by the plant's security team.

Approvals · Bonny Island

What an LNG operator's procurement will ask for

An LNG operator with international shareholders normally specifies electrical equipment to IEC standards, and expects the IECEx Certificate of Conformity with the marking, gas group, temperature class and ambient range stated. Ask Nigeria LNG's procurement and HSE teams for their contractor and equipment registration steps rather than assuming them. The Nigerian layer sits alongside: SONCAP for import clearance, NCC type approval for the radios, and documented local content through a Nigerian entity. The IS-04Z1 is pre-launch with certification in progress, and SAMS has no supply relationship with Nigeria LNG.

Ex evidence
IECEx certificate, marking and ambient range.
Site policy
Camera, photography and phone policy set by the operator.
Import
SONCAP product and per shipment documents.
Support
Repair and spares route held in country, not shipped per fault.
Questions · Bonny Island

Frequently asked questions

Is Train 7 already operating?

Press reports in 2026 describe it as more than 90 per cent complete and in systems completion and pre-commissioning, with a first cargo forecast for 2027. Confirm the current position with Nigeria LNG directly, because it decides which areas are classified and live.

Does LNG vapour need a Group IIC handset?

Methane and propane are Group IIA, and the plant also has hydrocarbon refrigerants. An Ex ib IIC target covers all common gas groups, which simplifies a fleet, but the area classification documents set the requirement.

Can the handset be used on a jetty with a ship alongside?

The jetty is classified and ship and shore have their own rules. A device is only allowed where the terminal and the ship's master agree, and the certificate has to support that zone.

Is NLNG buying the IS-04Z1?

No. SAMS has no order, pilot or agreement with Nigeria LNG. This page describes what the device is designed for at a plant like this.

Enquiry · Nigeria LNG

Ask about the IS-04Z1 for Nigeria LNG, Nigeria

Tell us the site, the zone and gas group, and roughly how many handsets. The SAMS team replies by email with the datasheet and the certification schedule for Nigeria. The IS-04Z1 is pre-launch and certification is in progress, so there is no list price yet; indicative pricing is issued in writing against a stated quantity and site.

Enquiry · Nigeria LNG

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter a valid phone number.
Please enter your target market.
Please select one.

Launching Q4 2026

Evaluating the IS-04Z1 for this site?

Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule for your market.