North Hub project
Reports describe an FPSO designed for 1 billion standard cubic feet of gas a day, in about 2,000 metres of water, with first steel cut in July 2026 and commercial production targeted for the fourth quarter of 2028.
Indonesia's offshore oil and gas includes the Kutai Basin off East Kalimantan, where the Makassar Strait North Hub project, operated by the Searah venture of Eni and Petronas, is building a floating production unit. Platforms, FPSOs and drilling rigs are classified hazardous areas. Distribution partners for Indonesian offshore oil and gas fields are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Indonesian offshore oil and gas fields has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP65 to IP68 sealing | IP68 design |
| Drop and shock | A stated drop height onto concrete | Specification on request |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Indonesian offshore oil and gas fields: Drilling rigs, Wellhead areas, Offshore production platforms | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Indonesia Offshore Rigs. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Reports describe an FPSO designed for 1 billion standard cubic feet of gas a day, in about 2,000 metres of water, with first steel cut in July 2026 and commercial production targeted for the fourth quarter of 2028.
Crews and equipment move by supply vessel or helicopter, so equipment is normally certified and approved before mobilisation.
Indonesia is said to have around 60 sedimentary basins, of which only 22 have been explored and exploited, so offshore drilling remains an active frontier for new fields.
About 80 per cent of people in the Natuna islands are of Malay origin, and Terengganuan Malay is used alongside Indonesian, which matters for hiring and site communication near the offshore gas area.
The Mahakam block, in East Kalimantan, was reported to supply around 30 percent of Indonesia's natural gas, about 1.7 billion cubic feet a day in mid-2013, plus condensate.
The East Natuna gas field in the South China Sea is believed to hold about 46 trillion cubic feet of proven gas, one of the biggest reserves in Southeast Asia, though development has been long delayed.
A rugged phone is built to survive water, dust, drops and rough handling, usually rated by an IP code and a drop specification. Ruggedness is an environmental property: it says nothing about whether a phone may be used where flammable gas or dust is present. That is decided by explosion-protection certification and marking.
The IS-04Z1 combines both: an IP68 sealed rugged build and a design for Zone 1 and Zone 21 (marking target Ex ib IIC T4). The explosion-protection certificates are in progress and none has been issued.
In Indonesian offshore oil and gas fields. Sea conditions are shaped by monsoon seasons, which affect access and weather windows. Salt spray, humidity and rain are constant offshore. IP68 helps against water and dust but is not explosion protection, which depends on certification and on the zone where the device is used.
A distributor for Indonesian offshore oil and gas fields would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
It is designed to IP68 sealing, with glove-friendly controls. Ruggedness is not explosion protection: that depends on the certificates, which are in progress.
Likely candidates are offshore production platforms, fpso process and storage areas, drilling rigs, wellhead areas. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Indonesian offshore oil and gas fields.
Usually not into classified areas. Offshore installations normally restrict personal electronics to safe areas unless a device carries the certification the operator accepts for the relevant zone and gas group. Ask the operator for its portable-electronics policy before mobilising.
Warm temperatures, high humidity, salt spray and heavy squalls are typical, so devices usually need good ingress protection, corrosion-resistant ports and sealed battery compartments. Check the rating against the rig's environment and the operator's specification.
Yes, because monsoon seasons affect access and weather windows, so spares and crew changes may be delayed. Plan extra devices and charging in a safe area. Salt and humidity also matter for seals. Confirm logistics with the operator's offshore team.
Related guides for Indonesia Offshore Rigs and for Indonesia.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.