Crude supply
The project includes a single point mooring for very large crude carriers and two one-million-barrel crude tanks at Lawe-Lawe.
Balikpapan in East Kalimantan is the site of Pertamina's Refinery Unit V, operated by PT Kilang Pertamina Balikpapan. After the upgrade the refinery can make fuel to Euro 5 standard, and it sits alongside Cilacap as one of Indonesia's two largest refineries, so new process units stand beside older ones in the same complex. An ATEX and IECEx mobile phone distributor in Balikpapan, East Kalimantan would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Balikpapan, East Kalimantan has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Balikpapan, East Kalimantan: Crude and product storage, Marine crude mooring and tanks, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Balikpapan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
The project includes a single point mooring for very large crude carriers and two one-million-barrel crude tanks at Lawe-Lawe.
Hot, humid equatorial conditions with rain through the year.
Indonesia's six large refineries are Cilacap, Balikpapan, Dumai, Musi, Balongan and Tuban, and the country imported about 787 thousand barrels a day of petroleum products in 2024, so reliability work at Balikpapan matters nationally.
Oil drilling began at Balikpapan on 10 February 1897, a date now used as the city's anniversary, and the Dutch company BPM made the town its headquarters in 1907, so petroleum has shaped the place for well over a century.
Pertamina took over the area's oil operations from Shell in 1965, and the refinery is now run by PT Kilang Pertamina Balikpapan, formed in 2019 to operate Refinery Unit V on an operation and maintenance basis.
The Balikpapan and Lawe-Lawe Refinery Development Master Plan raised crude capacity from 260 to 360 thousand barrels a day and added a 90 thousand barrel a day residue catalytic cracking unit.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Balikpapan, East Kalimantan. A Pertamina refinery reviewer in Balikpapan would want certificate evidence matched to markings, plus a schedule of conditions. For the IS-04Z1 that remains in progress. A dual ATEX and IECEx route helps the international contractors and EPC firms involved in the RDMP upgrade, who carry equipment records from other projects.
A distributor for Balikpapan, East Kalimantan would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are refinery process units, residual fluid catalytic cracking unit, crude and product storage, marine crude mooring and tanks. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Balikpapan, East Kalimantan.
Refinery Unit V is run by PT Kilang Pertamina Balikpapan, part of the Pertamina group. Contractors and suppliers normally register through Pertamina's vendor processes and follow the site's own permit and induction rules, so confirm the current route with the plant.
Yes. The upgrade added a residue catalytic cracking unit and raised capacity by 100 thousand barrels a day beside the existing units, so area classification drawings can differ between revamped and legacy sections. Ask for the current hazardous-area drawings for the unit you will work in.
Possibly, because new units bring new classified areas and contractor equipment rules. The operator sets the requirements for each phase. Ask Pertamina or its contractors for current device approval procedures and do not assume earlier approvals cover new areas. Confirm with the site operator.
Related guides for Balikpapan and for Indonesia.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.