North Hub project
Reports describe an FPSO designed for 1 billion standard cubic feet of gas a day, in about 2,000 metres of water, with first steel cut in July 2026 and commercial production targeted for the fourth quarter of 2028.
Indonesia's offshore oil and gas includes the Kutai Basin off East Kalimantan, where the Makassar Strait North Hub project, operated by the Searah venture of Eni and Petronas, is building a floating production unit. Platforms, FPSOs and drilling rigs are classified hazardous areas. An Ex-proof mobile phone distributor in Indonesian offshore oil and gas fields would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Indonesian offshore oil and gas fields has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ex marking | Group, category, protection concept, gas group, temperature class | II 2 G Ex ib IIC T4 (target) |
| Gas group | IIA, IIB or IIC matched to the area drawing | IIC (target) |
| Temperature class | T-class below the ignition temperature of the gas | T4, 135 °C (target) |
| Where it applies | Indonesian offshore oil and gas fields: Drilling rigs, Wellhead areas, Offshore production platforms | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Indonesia Offshore Rigs. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Reports describe an FPSO designed for 1 billion standard cubic feet of gas a day, in about 2,000 metres of water, with first steel cut in July 2026 and commercial production targeted for the fourth quarter of 2028.
Crews and equipment move by supply vessel or helicopter, so equipment is normally certified and approved before mobilisation.
Indonesia is said to have around 60 sedimentary basins, of which only 22 have been explored and exploited, so offshore drilling remains an active frontier for new fields.
About 80 per cent of people in the Natuna islands are of Malay origin, and Terengganuan Malay is used alongside Indonesian, which matters for hiring and site communication near the offshore gas area.
The Mahakam block, in East Kalimantan, was reported to supply around 30 percent of Indonesia's natural gas, about 1.7 billion cubic feet a day in mid-2013, plus condensate.
The East Natuna gas field in the South China Sea is believed to hold about 46 trillion cubic feet of proven gas, one of the biggest reserves in Southeast Asia, though development has been long delayed.
“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.
The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.
In Indonesian offshore oil and gas fields. An offshore marking check would read the zone for each deck, wellhead area or process module against the label. Hydrocarbon gas with some hydrogen-bearing streams may appear, so reviewers read the actual drawings. The IS-04Z1 target marking is II 2 G Ex ib IIC T4, which is unapproved.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Indonesian offshore oil and gas fields yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.
Likely candidates are offshore production platforms, fpso process and storage areas, drilling rigs, wellhead areas. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Indonesian offshore oil and gas fields.
Usually not into classified areas. Offshore installations normally restrict personal electronics to safe areas unless a device carries the certification the operator accepts for the relevant zone and gas group. Ask the operator for its portable-electronics policy before mobilising.
Warm temperatures, high humidity, salt spray and heavy squalls are typical, so devices usually need good ingress protection, corrosion-resistant ports and sealed battery compartments. Check the rating against the rig's environment and the operator's specification.
Yes, because monsoon seasons affect access and weather windows, so spares and crew changes may be delayed. Plan extra devices and charging in a safe area. Salt and humidity also matter for seals. Confirm logistics with the operator's offshore team.
More on Indonesia Offshore Rigs, and on other places in Indonesia.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.