Access
Das Island lies about 160 km north-west of the UAE mainland and is staffed by about 6,000 oil and gas personnel on a rotational schedule, so access is by operator-controlled sea and air transport.
The UAE's main offshore oil and gas fields lie in the Arabian Gulf off Abu Dhabi. Upper Zakum, discovered in 1963 and on stream since 1977, is operated as part of ADNOC Offshore (formerly ZADCO), with offshore output handled at island facilities such as Das Island and Zirku Island. Distribution partners for UAE offshore fields are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. UAE offshore fields has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP65 to IP68 sealing | IP68 design |
| Drop and shock | A stated drop height onto concrete | Specification on request |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | UAE offshore fields: Platform and subsea pipelines, Marine loading terminals, Offshore production platforms and islands | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in UAE Offshore. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Das Island lies about 160 km north-west of the UAE mainland and is staffed by about 6,000 oil and gas personnel on a rotational schedule, so access is by operator-controlled sea and air transport.
Desert marine climate; Zirku Island summer temperatures are typically 35 to 45 degrees C with high humidity.
Abu Dhabi's first offshore drilling platform was established at Umm Shaif in 1958, and the first crude export left Das Island in 1962.
ADNOC Drilling has been contracted to supply island rigs for wells on existing and new artificial islands at Zakum, with delivery expected from 2026.
Replacement of a 125 km oil pipeline from Umm Lulu to Zirku Island has been awarded as an offshore project, so subsea and island pipeline work is under way.
Zakum's artificial islands suit extended-reach drilling, and the five longest wells in the world are reported to have been drilled there.
A rugged phone is built to survive water, dust, drops and rough handling, usually rated by an IP code and a drop specification. Ruggedness is an environmental property: it says nothing about whether a phone may be used where flammable gas or dust is present. That is decided by explosion-protection certification and marking.
The IS-04Z1 combines both: an IP68 sealed rugged build and a design for Zone 1 and Zone 21 (marking target Ex ib IIC T4). The explosion-protection certificates are in progress and none has been issued.
In UAE offshore fields. The desert marine climate is hot and humid; Zirku Island summers reach 35 to 45 degrees C. Salt-laden air and spray are constant offshore. IP68 helps with water and dust, but it is not explosion protection, which depends on the Ex marking and certificate.
A distributor for UAE offshore fields would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
It is designed to IP68 sealing, with glove-friendly controls. Ruggedness is not explosion protection: that depends on the certificates, which are in progress.
Likely candidates are offshore production platforms and islands, island processing and terminals, platform and subsea pipelines, marine loading terminals. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for UAE offshore fields.
Upper Zakum is about 84 km north-west of the Abu Dhabi islands, and operations are based on islands such as Zirku and Das. Access is by boat or helicopter under the operator's control, so plan transit time and baggage limits for equipment.
Often the same standards apply, but offshore and island sites usually add stricter controls on ignition sources, wireless devices and marine transport. Approval is decided by the operator, so ask for its current equipment, certification and wireless policy before shipping devices.
Offshore crews rotate and sites are reached by sea and air under operator control. A phone would normally be enrolled in the employer's or operator's EMM or MDM. The IS-04Z1 is designed for EMM/MDM. Ask the operator how devices are issued, charged and handed over.
Related guides for UAE Offshore and for United Arab Emirates.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.