Access
Das Island lies about 160 km north-west of the UAE mainland and is staffed by about 6,000 oil and gas personnel on a rotational schedule, so access is by operator-controlled sea and air transport.
The UAE's main offshore oil and gas fields lie in the Arabian Gulf off Abu Dhabi. Upper Zakum, discovered in 1963 and on stream since 1977, is operated as part of ADNOC Offshore (formerly ZADCO), with offshore output handled at island facilities such as Das Island and Zirku Island. An Ex-proof mobile phone distributor in UAE offshore fields would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. UAE offshore fields has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ex marking | Group, category, protection concept, gas group, temperature class | II 2 G Ex ib IIC T4 (target) |
| Gas group | IIA, IIB or IIC matched to the area drawing | IIC (target) |
| Temperature class | T-class below the ignition temperature of the gas | T4, 135 °C (target) |
| Where it applies | UAE offshore fields: Platform and subsea pipelines, Marine loading terminals, Offshore production platforms and islands | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in UAE Offshore. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Das Island lies about 160 km north-west of the UAE mainland and is staffed by about 6,000 oil and gas personnel on a rotational schedule, so access is by operator-controlled sea and air transport.
Desert marine climate; Zirku Island summer temperatures are typically 35 to 45 degrees C with high humidity.
Abu Dhabi's first offshore drilling platform was established at Umm Shaif in 1958, and the first crude export left Das Island in 1962.
ADNOC Drilling has been contracted to supply island rigs for wells on existing and new artificial islands at Zakum, with delivery expected from 2026.
Replacement of a 125 km oil pipeline from Umm Lulu to Zirku Island has been awarded as an offshore project, so subsea and island pipeline work is under way.
Zakum's artificial islands suit extended-reach drilling, and the five longest wells in the world are reported to have been drilled there.
“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.
The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.
In UAE offshore fields. A marking check offshore would compare each platform or island area's zone, gas group and temperature class with the device marking. Hydrocarbon production areas may be Zone 1, and gas groups depend on the product. The IS-04Z1 target, II 2 G Ex ib IIC T4, is in progress and not certified.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for UAE offshore fields. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.
Likely candidates are offshore production platforms and islands, island processing and terminals, platform and subsea pipelines, marine loading terminals. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for UAE offshore fields.
Upper Zakum is about 84 km north-west of the Abu Dhabi islands, and operations are based on islands such as Zirku and Das. Access is by boat or helicopter under the operator's control, so plan transit time and baggage limits for equipment.
Often the same standards apply, but offshore and island sites usually add stricter controls on ignition sources, wireless devices and marine transport. Approval is decided by the operator, so ask for its current equipment, certification and wireless policy before shipping devices.
Offshore crews rotate and sites are reached by sea and air under operator control. A phone would normally be enrolled in the employer's or operator's EMM or MDM. The IS-04Z1 is designed for EMM/MDM. Ask the operator how devices are issued, charged and handed over.
Other guides for UAE Offshore, other places in United Arab Emirates, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.