Ownership
ADNOC owns Upper Zakum, with ExxonMobil holding 28 per cent and JODCO 12 per cent.
Zakum's artificial islands suit extended-reach drilling, and the five longest wells in the world are reported to have been drilled there. Upper Zakum, discovered in 1963 and on stream since 1977, is operated as part of ADNOC Offshore (formerly ZADCO), with offshore output handled at island facilities such as Das Island and Zirku Island. This page explains what to look for in an IECEx mobile phone for UAE offshore fields, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for UAE offshore fields: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | UAE offshore fields: Offshore production platforms and islands, Island processing and terminals, Platform and subsea pipelines | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in UAE Offshore. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
ADNOC owns Upper Zakum, with ExxonMobil holding 28 per cent and JODCO 12 per cent.
Das Island lies about 160 km north-west of the UAE mainland and is staffed by about 6,000 oil and gas personnel on a rotational schedule, so access is by operator-controlled sea and air transport.
UAE phones need federal type approval from the Telecommunications and Digital Government Regulatory Authority, and offshore operators may add their own device rules on top.
ADNOC plans facilities to sustain production through 2030 on five islands: Zirku, Asseifiya, Umm Al Anbar, Al Ghallan and Ettouk.
Upper and Lower Zakum together hold around 50 billion barrels of oil in place and form the second largest offshore oilfield in the world.
Abu Dhabi's first offshore drilling platform was established at Umm Shaif in 1958, and the first crude export left Das Island in 1962.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In UAE offshore fields. Offshore crews and contractors often work for international firms, and some fields have international shareholders. IECEx gives them a shared reference, with a certificate of conformity and schedule of conditions to read together. SAMS has no IECEx certificate for the IS-04Z1; certification is in progress.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are offshore production platforms and islands, island processing and terminals, platform and subsea pipelines, marine loading terminals. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Artificial islands let operators drill many wells and handle production from fixed land-like platforms, and they favour extended-reach drilling. ADNOC Drilling has been contracted for new island rigs, so contractor numbers on the islands may rise. Confirm access and equipment rules with ADNOC Offshore.
Salt-laden humid air is typical, so look for sealed housings, corrosion-resistant connectors and a stated ingress protection rating. Rinse and dry devices as the manufacturer advises, and carry spares, as resupply is by sea or air.
The offshore setting is hot and humid with salt-laden air; Zirku Island summers reach 35 to 45 degrees C. The IS-04Z1 is designed to IP68 with a 4,000 mAh battery, but no heat or salt limits are published. Ask for the datasheet and agree use conditions with the operator.
Related guides for UAE Offshore and for United Arab Emirates.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.