Deep-water port
The port has deep-water jetties able to handle very large vessels, including Valemax ore carriers.
Sohar is the capital of Al Batinah North Governorate and hosts SOHAR Port and Freezone, a deep-sea industrial port on the Gulf of Oman. Hafeet Rail is building a 238 km line to connect the port with the UAE national network, and its first track shipment arrived through the Steinweg general cargo terminal. Distribution partners for Sohar are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Sohar has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | Sohar: Fuel and chemical storage, Industrial plant utilities, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Sohar. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
The port has deep-water jetties able to handle very large vessels, including Valemax ore carriers.
The Sohar Aluminium smelter has a capacity of roughly 390,000 tonnes a year with its own power plant, so construction and maintenance contractors are present.
Government development plans for Sohar include more than 5 billion US dollars of investment in the steel industry, which adds heavy-industry maintenance work to the port's chemical and fuel sites.
SOHAR Port is described as handling more than one million tonnes of sea cargo a week and around 3,500 ship calls a year, so jetty and yard traffic is continuous.
The first lease at the new port was signed with Sohar Refinery in 2003, and the free zone itself was established in 2010, so many plants are of 2000s to 2010s vintage.
C. Steinweg Oman holds the concession for dry bulk, break-bulk, roll-on/roll-off and container stuffing operations in the port, so cargo-side contractors work under a separate terminal operator.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In Sohar. Inspection and turnaround crews at the refinery and port move between process units, tankage and berths. An intrinsically safe handheld lets them keep photos, readings and permits on one device through classified areas. That is the purpose of the IS-04Z1 design, subject to certification and operator acceptance.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Sohar yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
Likely candidates are refinery process units, port liquid bulk handling, fuel and chemical storage, industrial plant utilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Sohar.
Radio equipment sold or used in Oman normally needs Telecommunications Regulatory Authority type approval or a declaration of conformity route, with a TRA label. Requirements change, so check the authority's current rules or ask your local importer before shipment.
Typically the tenant or terminal operator, not the port authority alone. Dry-bulk and general cargo areas run under a terminal concession, while refinery and chemical tenants have their own HSE rules. Confirm the approval route with the site operator before shipping any device.
Summers are extremely hot, with a record of 50.8 C, and rainfall is low. Check the certified ambient range, keep devices out of direct sun and charge only in a safe area. IP68 helps with dust but is not explosion protection.
Related guides for Sohar and for Oman.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.