Indian Oil's board approved expansion from 15 to 25 million tonnes a year; recent reports put full commissioning around December 2026, so project contractors are active on site.
Panipat in Haryana hosts Indian Oil's refinery and petrochemical complex at Baholi, which began operating in 1998 and now processes 15 million tonnes a year. A diesel hydrodesulphurisation unit was commissioned in 1999 to produce low-sulphur diesel. Distribution partners for Panipat, Haryana are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Panipat, Haryana has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Panipat, Haryana: Product tank farms, Loading gantries, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Panipat India. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Indian Oil's board approved expansion from 15 to 25 million tonnes a year; recent reports put full commissioning around December 2026, so project contractors are active on site.
Crude arrives by pipeline from the Gujarat coast. Summers are generally hot and dusty, with cold foggy winters.
The refinery supplies Haryana and the north-west region, including Punjab, Jammu and Kashmir, Himachal Pradesh, Chandigarh, Uttarakhand and parts of Rajasthan and Delhi.
It receives crude through the Salaya-Mathura pipeline and handles both domestic and imported crudes.
Major units include a hydrocracker, resid fluidised catalytic cracker, visbreaker, delayed coker, bitumen blowing unit, hydrogen generation unit and sulphur block.
Panipat Refinery at Baholi, Indian Oil's seventh, was set up in 1998 at 6 million tonnes a year and has since been expanded to 15 million tonnes a year.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Panipat, Haryana. Active project work means many contractor crews on site, with changing headcount through commissioning. MDM or EMM enrolment, which the IS-04Z1 supports, lets the operator add and retire devices cleanly. Charging belongs in safe areas such as site offices and control buildings.
A distributor for Panipat, Haryana would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are refinery process units, naphtha cracker and petrochemical units, product tank farms, loading gantries. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Panipat, Haryana.
Northern India has hot summers and cooler winters, so check a handset's operating temperature range at both ends of the year, including battery performance in the cold. Confirm all figures on the manufacturer's datasheet.
Panipat is 95 kilometres north of Delhi on NH-44 and 169 kilometres south of Chandigarh, so it is normally reached by road from Delhi. Confirm gate procedures and security passes with the operator in advance.
They will have their own classification records once designed, which may differ from existing units. Completion dates have slipped before, so timing is reported rather than fixed. Confirm with the operator or project contractor when the area documents will be available.
Related guides for Panipat India and for India.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.