Marine access
Reliance states that its marine infrastructure takes vessels from small chemical carriers to very large crude carriers.
Jamnagar, on the Gulf of Kutch coast in Gujarat, hosts Reliance Industries' refining complex at Motikhavdi, which Reliance describes as the world's largest single-site refinery at 1.4 million barrels a day. Polymer exports from the Jamnagar complex were moved through Port Pipavav by container, with volumes quadrupled to over 10,000 forty-foot containers in one year. An ATEX and IECEx mobile phone distributor in Jamnagar, Gujarat would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Jamnagar, Gujarat has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Jamnagar, Gujarat: Refinery off-gas cracker and petrochemical units, Crude and product tank farms, Marine loading facilities | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Jamnagar India. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Reliance states that its marine infrastructure takes vessels from small chemical carriers to very large crude carriers.
Wikipedia quotes 1.24 million barrels a day, while Reliance's current site quotes 1.4 million; the operator's figure is used here.
The metropolitan area had about 877,000 residents in 2025, most speak Gujarati, and the literacy rate is about 82 percent.
The complex covers over 7,500 acres and includes utilities, port facilities and a 415-acre township for about 2,500 employees, according to a 2013 description.
The refinery was commissioned within 36 months, which means much of its equipment dates from around the turn of the century.
Jamnagar is known as the Brass City, with over 5,000 large and 10,000 small brass workshops, so local engineering and fabrication skills are widely available.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Jamnagar, Gujarat. The Reliance complex at Motikhavdi is large enough that its own HSE and procurement teams, plus visiting international contractors, may each ask for certificate evidence. A dual ATEX and IECEx route addresses both audiences. The IS-04Z1 has no certificate yet, and both certification routes remain in progress.
A distributor for Jamnagar, Gujarat would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are refinery process units, petcoke gasification, refinery off-gas cracker and petrochemical units, crude and product tank farms. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Jamnagar, Gujarat.
The refinery complex handles over a million barrels a day plus petrochemical units and port facilities, so classified areas are extensive. The operator sets the zones and equipment rules, so confirm them before entering.
The area has a large industrial and fabrication base, including thousands of brass workshops, and a workforce that mostly speaks Gujarati. Operators still require site induction, so plan time for approvals.
Large sites mean long walks and long shifts, so battery life, charging points and a robust housing matter. Charging must happen in safe areas, not in classified ones. Ask the operator what charging and spare-device arrangements are permitted before planning a fleet.
Related guides for Jamnagar India and for India.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.