Bay logistics
FPSO hulls berth at the yard for integration, for example Cidade de Marica in 2015.
Niteroi lies across Guanabara Bay from Rio de Janeiro and is mainly a commercial city. The municipality contains part of the 2,400 hectare Serra da Tiririca State Park, created in 1991, which affects where new industrial or construction projects can be sited. Distribution partners for Niteroi are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Niteroi has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Niteroi: FPSO module fabrication and integration, Shipyard tank and hull work, Fuel and gas handling at quaysides | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Niteroi. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
FPSO hulls berth at the yard for integration, for example Cidade de Marica in 2015.
Niteroi has a tropical monsoon climate with warm temperatures year-round and frequent rain.
Niteroi has a tropical monsoon climate with warm to hot temperatures all year and relatively frequent rainfall, so humidity is a constant factor for equipment stored or used outdoors.
The Rio-Niterói Bridge, completed in 1974, is 13.29 km long and has a 72 m high central span so that ships can pass into Guanabara Bay, linking Niterói to Rio de Janeiro by road.
Niteroi lies across Guanabara Bay from Rio de Janeiro; it was founded in 1573 and served as capital of Rio de Janeiro state until 1975, apart from a short period from 1894 to 1903.
Industry reports in 2025 said Hanwha Ocean was considering a shipyard in Niteroi to meet local-content requirements tied to Petrobras projects such as the FPSO P-86 tender.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Niteroi. The 65,000 square metre yard is within the Rio metropolitan area across the bay from downtown, so contractors come and go daily. Project crews turn over, so MDM or EMM enrolment helps keep handsets managed. Charging is done in safe cabins or offices. Current workload should be confirmed.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Niteroi yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are fpso module fabrication and integration, shipyard tank and hull work, fuel and gas handling at quaysides. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Niteroi.
Local-content requirements are a decisive factor in Petrobras tenders, and shipyards respond to them. For handheld devices it is usually a contractor-level question, so confirm with the yard or main contractor whether domestic sourcing or registration applies.
A tropical monsoon climate means warm, humid weather and frequent rain, so sealed cases, drying routines and spare batteries are sensible. Confirm the operator's ingress protection and temperature requirements for outdoor classified areas.
Only where the work is classified, such as tank and hull work or fuel and gas handling at quaysides, as set by the yard and its HSE team. Other areas may not be. Confirm the classification for each job with the site operator.
Related guides for Niteroi and for Brazil.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Name the site and the operator and we will send what is available before launch.