Service concentration
With so many contractors based locally, equipment is often bought, prepared and serviced here before shipment offshore.
Macae is a city in the north of Rio de Janeiro state, known as Brazil's national oil capital. A new 1,410 metre runway, a roughly R$220 million investment by the airport concessionaire Zurich Airport Brasil, is being built to let larger aircraft use the airport. Distribution partners for Macae are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Macae has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Macae: Workshops handling offshore equipment, Onshore oil and gas handling, Offshore supply bases and quays | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Macaé. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
With so many contractors based locally, equipment is often bought, prepared and serviced here before shipment offshore.
Daytime highs average about 28.5 C with around 1,215 mm of rain a year.
Macae is generally considered the centre of Brazil's offshore petroleum industry and is nicknamed Cidade do Petroleo (City of Petroleum), with many Petrobras facilities inside the town.
Macae Airport now has six helicopter operators meeting the safety standards Petrobras requires, with seven hangars, four shared lounges and a workspace area in the check-in hall.
Since the 1970s, when Petrobras chose Macae as its Campos Basin base, more than 4,000 companies have set up offices there and the population has roughly tripled.
An airport spotting guide reports about 2,000 helicopter operations a month, around 60 to 70 a day, mostly medium and heavy helicopters, plus two daily scheduled airline flights.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Macae. Equipment here is often bought, prepared and serviced locally before shipment, so fleet preparation can happen in one place. EMM or MDM enrolment, configuration and test charging in safe areas fit that routine well. Many contractors based locally means many separate fleets.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Macae. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are offshore supply bases and quays, heliport and fuel storage, workshops handling offshore equipment, onshore oil and gas handling. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Macae.
The coast is humid and salty, so expect corrosion and condensation on connectors and cases. Choose sealed housings, rinse and dry equipment after offshore trips, and ask the contractor about storage conditions at the heliport and base.
Courses are delivered by operators, specialised training centres and the city's technical institutions, and platform inductions are set by the operator. Confirm which course certificates your crew need and whether device handling is covered in the induction.
That is a common practice, since equipment is often bought, prepared and serviced here before shipment. Enrolment, configuration and charging can be done onshore in safe areas. Confirm the offshore operator's approval and documentation requirements before sending anything out.
Related guides for Macaé and for Brazil.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.