Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Duque de Caxias · IECEx

IECEx Smartphone Distributor in Duque de Caxias

Duque de Caxias is an industrial municipality on Guanabara Bay about 17 km from downtown Rio de Janeiro. It hosts the Petrobras Duque de Caxias refinery (Reduc), which started up in 1961, so refining and gas-processing units create Zone 1 areas. An IECEx smartphone distributor in Duque de Caxias would carry the IS-04Z1 to these buyers once certification completes.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Duque de Caxias, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicIECEx
DeviceSmartphone
RouteDistribution
WhereDuque de Caxias

Short answer. Duque de Caxias has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.

Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.

At a glance · IECEx

Checklist: IECEx smartphone for Duque de Caxias

Checks a reviewer should make, with the IS-04Z1 position
CheckWhat to look forIS-04Z1 today
Certificate of conformityNumber checkable on the IECEx online registerIn progress; not issued
Standards editionThe IEC 60079 edition the certificate citesStated on the certificate when issued
Schedule of conditionsLimits of use, batteries and accessoriesPublished with the certificate
Where it appliesDuque de Caxias: Loading and dispatch areas, Biofuel (SAF and renewable diesel) processing, Refinery process unitsClassified by the site operator
Product · Duque de Caxias

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Duque de Caxias. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The site · Duque de Caxias

Duque de Caxias at a glance: who is there, what is classified

A short profile of the site and the kinds of classified area that matter for portable equipment.

Operators and companies on site

  • Petrobras (Reduc refinery)

Classified areas to expect

  • Refinery process units
  • Tank farms and pipelines
  • Loading and dispatch areas
  • Biofuel (SAF and renewable diesel) processing
Local conditions · Duque de Caxias

Conditions in Duque de Caxias that affect handheld equipment

Large multi-product site

Reduc makes more than 40 products and has a stated capacity of 239,000 barrels a day.

Investment programme

Petrobras plans US$4.6 billion for Reduc in 2026-2030, with maintenance shutdowns of the coking and hydrotreating units scheduled in 2026.

Field notes · Duque de Caxias

More about Duque de Caxias that matters for portable equipment

Duque de Caxias: projects and investment

Reduc is listed among the Petrobras refineries receiving modernisation (revamp) projects in the company's refining investment portfolio, alongside Replan and the Presidente Bernardes refinery.

Duque de Caxias: industry on the ground

Reduc sells about 55 different products, the most of any Petrobras refinery, from diesel, jet fuel and asphalt to LPG, paraffins, lubricants, coke and sulphur, so many hazardous product streams are handled on site.

Duque de Caxias: infrastructure

Petrobras has installed a reverse osmosis system supplied by SETA to treat and reuse refinery effluents, an example of the water-management projects that run alongside normal operations.

Duque de Caxias: background

Reduc began operating in 1961 near Rio de Janeiro, one of the early refineries built after Petrobras was created in 1953 with a legal monopoly.

The term · IECEx

What “IECEx” means for a smartphone

IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.

The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.

In Duque de Caxias. Petrobras plans US$4.6 billion for Reduc in 2026-2030, which may bring international EPCs and specialists to Duque de Caxias. IECEx offers them a familiar certificate of conformity and schedule of conditions. The IS-04Z1 IECEx certification is in progress, not held.

The route · distribution

Distributing the IS-04Z1 in Duque de Caxias

SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Duque de Caxias yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.

What SAMS looks for in a partner

Operator relationships
Existing supplier registrations or a clear route to them with the main operators and contractors in Duque de Caxias.
Ex-competent staff
People who understand zone classification, markings and the conditions of a certificate.

And equally important

Local-language support
Documentation, training and helpdesk in the languages the workforce uses.
Service capability
Spares, battery replacement and repair routed through SAMS-approved channels.
Questions · Duque de Caxias

Frequently asked questions

Can we buy an IECEx smartphone in Duque de Caxias today?

Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.

What does an IECEx smartphone in Duque de Caxias cost?

No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.

Does the IS-04Z1 hold an IECEx certificate?

No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.

Which areas at Duque de Caxias would use it?

Likely candidates are refinery process units, tank farms and pipelines, loading and dispatch areas, biofuel (saf and renewable diesel) processing. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.

How do I become a SAMS distributor for Duque de Caxias?

Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Duque de Caxias.

How should I plan devices for a Rio de Janeiro refinery visit?

Typically choose a device with the right zone, gas group and temperature class, carry its certificate, and confirm local radio approval requirements. Many sites also require induction and an approved-equipment check at the gate, so allow time for that.

What does the refinery's lubricant and gas role mean for hazard types?

Lubricant plants and gas processing mean both flammable liquids and flammable gases can occur, sometimes with hydrocarbon vapours near ambient temperature. Ask the operator for the applicable gas groups; do not assume one device rating covers every unit.

Will the 2026 shutdowns affect when I should order?

Maintenance shutdowns of the coking and hydrotreating units are scheduled in 2026, which brings large contractor numbers into classified areas. Plan lead times early. Certification is in progress, so confirm schedules and requirements with the site operator and its HSE team.

Enquiry · Duque de Caxias

Ask about the IS-04Z1 for Duque de Caxias, Brazil

Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.

Enquiry · Duque de Caxias

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Duque de Caxias?

Send the zone and gas group of your site and we will reply with the datasheet and schedule.