Large terminal
TEBIG has ten oil tanks totalling 845,557 cubic metres and two piers able to take vessels of up to 500,000 DWT.
Angra dos Reis is a municipality in the south of Rio de Janeiro state on Ilha Grande bay. It hosts the Transpetro TEBIG crude oil terminal and the BrasFELS shipyard, so tank-farm, tanker-berth and offshore-unit fabrication hazardous areas are both present. An IECEx smartphone distributor in Angra dos Reis would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Angra dos Reis has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Angra dos Reis: Shipyard offshore-unit fabrication and integration, Bunker fuel barge supply, Crude oil tank storage | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Angra dos Reis. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
TEBIG has ten oil tanks totalling 845,557 cubic metres and two piers able to take vessels of up to 500,000 DWT.
BrasFELS covers 52 hectares with dry docks and gantry cranes of 660 and 2,000 tonnes, and has worked on FPSO topside modules.
The port of Angra dos Reis includes an oil terminal, and the TEBIG facility used by Petrobras in the Bay of Ilha Grande moves large quantities of crude oil, which makes it one of the busiest ports in Brazil.
The semisubmersible platform P-56 was integrated at BrasFELS: about 54,658 tonnes, living quarters for 200 people, 79 risers and a power plant of 100 MW, built with a 72.9 percent domestic content index for its topside.
The municipality covers 816 km2, has a tropical monsoon climate, hilly terrain and more than 300 islands, the largest being Ilha Grande, so many work locations are coastal or island sites.
Construction of a third unit, Angra 3, began in 1984, was halted in 1986 and again in 2015, and in 2024 the operator Eletronuclear won a court appeal against a municipal work embargo.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Angra dos Reis. Angra dos Reis combines a Transpetro terminal with a Seatrium yard that has handled FPSO topside work, so international contractors are plausible visitors. IECEx offers them a familiar certificate of conformity and schedule of conditions. Brazilian use would still involve Inmetro routes; the IS-04Z1 IECEx process is in progress.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Angra dos Reis yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are crude oil tank storage, tanker piers and loading arms, shipyard offshore-unit fabrication and integration, bunker fuel barge supply. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Angra dos Reis.
Often only within the shipyard's own rules. Classified areas on hulls, tanks and process modules are usually managed with permits and gas testing, and devices may need to be certified for the relevant zone. Confirm the zone, gas group and temperature class with the yard before bringing equipment.
Typically the crude oil terminal, tanker berths and offshore-unit outfitting at the shipyard, where flammable gas or vapour can be present. The nuclear plant is controlled separately by its operator, so confirm device rules and zone classification with each site owner.
Ex equipment in Brazil goes through Inmetro-accredited certification bodies, so a purchaser should expect to ask for that route. The IS-04Z1 is not yet certified. Confirm documentation requirements with the site operator and its HSE team before ordering.
More on Angra dos Reis, and on other places in Brazil.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.