Climate
Hot, humid Gulf coastal climate; outdoor equipment should resist heat and salt air.
ENOC opened its first oil refinery in 1999 at 120,000 barrels a day for about 1.5 billion dirhams, so Dubai's refining is much younger than Abu Dhabi's. Process units, tank farms and jetties are classified areas. A hazardous area smartphone distributor in UAE refineries would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. UAE refineries has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | UAE refineries: Loading jetties and gantries, Product pipelines, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in UAE Refineries. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Hot, humid Gulf coastal climate; outdoor equipment should resist heat and salt air.
The Ruwais refinery connects to three jetties on the Gulf and a pipeline network of more than 1,600 km across the emirate for distributing fuels.
Ruwais Refinery West opened in 2014 with 417,000 barrels a day and contains a very large residue catalytic cracking unit that upgrades about 127,000 barrels a day of heavy residue into middle distillates.
One published refinery list gives the Jebel Ali refinery a capacity of 140,000 barrels a day, showing that it is a mid-sized plant compared with the Ruwais complex.
ADNOC's Ruwais Refinery East can process up to 922,000 barrels a day of crude and condensate, the largest refinery in the Middle East, and is closely integrated with other plants in the Ruwais industrial area.
The same list shows smaller Fujairah plants of 80,000, 7,500 and 70,000 barrels a day, so refining sites are scattered across the east coast as well as the Gulf.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In UAE refineries. UAE refineries have process units, tank farms, loading jetties and gantries, and product pipelines. ADNOC, as operator, classifies its own areas, not SAMS. The Ruwais complex connects to three Gulf jetties and a pipeline network over 1,600 km long, so classified areas extend beyond the refinery fence.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for UAE refineries yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are refinery process units, tank farms, loading jetties and gantries, product pipelines. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for UAE refineries.
A splitter typically produces mostly naphtha and jet fuel, which are light, volatile and easily ignited, so flammable vapour is the main concern. That usually means gas classification around pumps, tanks and loading areas; the operator sets the zones and gas group.
One published list gives Jebel Ali about 140,000 barrels a day, against several hundred thousand for the Ruwais complex. Smaller plants can mean fewer units on site, but hazards per unit are similar, and each has its own rules for contractors.
The Gulf coast is hot and humid, and outdoor equipment should resist heat and salt air. The IS-04Z1 is designed to IP68 with a 4,000 mAh battery, but heat and salt limits are not published. Ask for the datasheet and agree outdoor-use conditions with the operator.
Other guides for UAE Refineries, other places in United Arab Emirates, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.