Climate
Desert marine climate; Zirku Island summer temperatures are typically 35 to 45 degrees C with high humidity.
The UAE's main offshore oil and gas fields lie in the Arabian Gulf off Abu Dhabi. Zakum's artificial islands suit extended-reach drilling, and the five longest wells in the world are reported to have been drilled there. This page explains what to look for in a hazardous area mobile phone for UAE offshore fields, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for UAE offshore fields: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | UAE offshore fields: Offshore production platforms and islands, Island processing and terminals, Platform and subsea pipelines | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in UAE Offshore. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Desert marine climate; Zirku Island summer temperatures are typically 35 to 45 degrees C with high humidity.
ADNOC owns Upper Zakum, with ExxonMobil holding 28 per cent and JODCO 12 per cent.
ADNOC Drilling has been contracted to supply island rigs for wells on existing and new artificial islands at Zakum, with delivery expected from 2026.
Replacement of a 125 km oil pipeline from Umm Lulu to Zirku Island has been awarded as an offshore project, so subsea and island pipeline work is under way.
Upper Zakum lies about 84 km north-west of the Abu Dhabi islands, so it is a boat or helicopter journey from the mainland.
UAE phones need federal type approval from the Telecommunications and Digital Government Regulatory Authority, and offshore operators may add their own device rules on top.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In UAE offshore fields. UAE offshore classified areas include production platforms and islands, island processing and terminals, subsea and platform pipelines, and marine loading terminals. The operator, such as ADNOC Offshore, classifies its own areas, not SAMS. This is a generic grouping, not a single site.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are offshore production platforms and islands, island processing and terminals, platform and subsea pipelines, marine loading terminals. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Artificial islands let operators drill many wells and handle production from fixed land-like platforms, and they favour extended-reach drilling. ADNOC Drilling has been contracted for new island rigs, so contractor numbers on the islands may rise. Confirm access and equipment rules with ADNOC Offshore.
Salt-laden humid air is typical, so look for sealed housings, corrosion-resistant connectors and a stated ingress protection rating. Rinse and dry devices as the manufacturer advises, and carry spares, as resupply is by sea or air.
The offshore setting is hot and humid with salt-laden air; Zirku Island summers reach 35 to 45 degrees C. The IS-04Z1 is designed to IP68 with a 4,000 mAh battery, but no heat or salt limits are published. Ask for the datasheet and agree use conditions with the operator.
More on UAE Offshore, and on other places in United Arab Emirates.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Name the site and the operator and we will send what is available before launch.