Expansion
A nitric acid and ammonium nitrate plant was contracted in 2023 for about USD 300 million, with 800 tonnes per day of ammonium nitrate targeted by the end of 2027.
Aswan, in Upper Egypt, is home to the KIMA fertiliser company, whose ammonia and urea plant started up in 2020, and to long-established granite quarries. Aswan's granite quarries supplied stone to many ancient monuments and are still operating today, so quarrying, blasting stores and heavy plant add a mining-type hazard profile near the city. If you are specifying a hazardous area mobile phone for Aswan, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Aswan: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Aswan: Ammonia and urea production, Nitric acid and ammonium nitrate handling (under construction), Quarry explosives storage | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Aswan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
A nitric acid and ammonium nitrate plant was contracted in 2023 for about USD 300 million, with 800 tonnes per day of ammonium nitrate targeted by the end of 2027.
Aswan has an extremely dry desert climate and very hot summers, so heat tolerance matters for devices.
Aswan is a busy market and tourist centre and a global winter tourist destination, so hotels, transport and visitors share the city with its industrial and utility sites.
Benban Solar Park, about 40 km north-west of Aswan, has 1.8 GW installed over 37.2 square km in 41 plots, connected through four new substations built by the Egyptian Electricity Transmission Company.
The Aswan High Dam was built across the Nile at Aswan between 1960 and 1970 to control flooding, store irrigation water and generate hydroelectricity, creating the Lake Nasser reservoir upstream.
Hydropower contributed 6% of Egypt's electricity in 2025 and wind and solar 7%, while fossil fuels still generated 87%, so Aswan's hydro is a small but visible part of the national mix.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Aswan. Hazardous or controlled areas in Aswan include ammonia and urea production, nitric acid and ammonium nitrate handling under construction, and quarry explosives storage. The operators classify them. The Egyptian Organization for Standardization and Quality is listed, but its hazardous-area remit is not confirmed, so ask the operator.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are ammonia and urea production, nitric acid and ammonium nitrate handling (under construction), quarry explosives storage. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Aswan is in southern Egypt, where summers are typically very hot and dry, so check the maximum ambient temperature on the certificate, the dust ingress rating and battery behaviour in heat. Avoid leaving devices in vehicles or in direct sun, and plan outdoor work around the cooler hours.
Not necessarily, because zones depend on the specific area. Hydroelectric halls are often non-hazardous, while battery rooms, fuel stores, transformer oil areas and some tunnels may be classified. Request the operator's hazardous-area drawings and permit-to-work rules before deciding which devices to bring.
A nitric acid and ammonium nitrate plant was contracted in 2023, with 800 tonnes per day of ammonium nitrate targeted by the end of 2027. Construction and commissioning activity may therefore continue. Ask KIMA which areas are classified at present and how it handles contractor equipment.
Related guides for Aswan and for Egypt.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.